Table of Contents
|
Summary
An individual at the Arc of Monroe County would like a way to communicate with others. This individual can hear and understand others, and has normal vision, but is unable to speak. The Arc has requested a picture-based communication board that will allow this individual to touch graphic elements on a screen or keyboard to construct simple sentences or phrases. The device will either display the sentence or speak the sentence for the individual.
This material is based upon work supported by the National Science Foundation under Award No. BES-0527358. Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author and do not necessarily reflect the views of the National Science Foundation.
| Team Member | Discipline | Role | email address |
|---|---|---|---|
| Elizabeth DeBartolo | ME | Guide | eademe@rit.edu |
| Daniel Phillips | EE | Consultant | dbpeee@rit.edu |
| Ryan Larcom | ME | Project Manager & Mechanical Sub-system Lead | smurf@mail.rit.edu |
| George Shieh | EE | Lead Engineer & Software Sub-system Co-Lead | gxs8716@rit.edu |
| Travis Driscoll | EE | Component & Product Sub-system Lead | sisu1331@yahoo.com |
| Suesie Kim | EE | Software Sub-system Lead | suesiekim@gmail.com |
| Salim Maani | ISE | ISE Sub-system Lead | salimsc@gmail.com |
| Jeff Park | EE | Embedded Hardware Sub-system Lead | jyp9752@rit.edu |
Mission Statement
This project will be initiated during the Fall Quarter, 2006-1, with two other projects from the Assistive Devices family of projects in the Assistive Devices and Bioengineering Track. All three projects share a focus of providing a robust, configurable and easy to manipulate, embedded processor based user interface that will facilitate the activities of individuals with a particular physical challenge.| Project | Title | Start Term | End Term |
|---|---|---|---|
| P07000 | Assistive Devices and Bioengineering Track | 2006-1 | On-going |
| P07002 | Two way communication board | 2006-1 | 2006-2 |
| P07003 | Mobile Camera Control System | 2006-1 | 2006-2 |
| P07004 | Mobile Camera Positioning Platform | 2006-2 | 2006-3 |
Project Readiness Package
The Project Readiness Page documents customer needs and expectations, project deliverables (including time frame), budget, and personnel / organizations affiliated with the project. It will serve as the primary source of information for students necessary during Phase 0 (Planning) to develop a SD I plan and schedule including specific deliverables and due dates. The Project Readiness Package will also support Faculty evaluation of project suitability in terms of depth, scope, and student / faculty resources by discipline.General Project Uploads
This section is for documentation common to the overall project. For specific sub-sections' documents, see the individual sub-section pagesSenior Design I (Fall 20061)
- Schedules
- 11-week Project Schedule (Adobe PDF)
-
11-week
Project Schedule MPP (MS Project)
- Project Summary
-
1-Page
Project Summary (MS Word)
-
1-Page
Project Summary (MS Word)
- Customer Needs
-
Need-Metric
Categorization (MS Excel)
-
Need-Metric
Evaluation (MS Excel)
-
QFD (MS Excel)
-
Need-Metric
Categorization (MS Excel)
- Initial Concepts
-
Concept
Generation (MS Excel)
- Functional Block Diagram JPG (JPEG)
-
Functional
Block Diagram (MS Viseo)
-
Concept
Generation (MS Excel)
- Critical Sub-functions
-
Critical
Sub-functions Matrix (MS Excel)
-
Critical
Sub-functions Matrix (MS Excel)
- BOM & Budget
-
Prelim BOM (MS
Excel)
-
Budget (MS Excel)- as of
11/3/2006
-
Prelim BOM (MS
Excel)
- Test Plan
- Test Plan (MS Word)
Senior Design II (Spring 20063)
- Schedules
-
Winter Schedule
(Adobe PDF)
-
Spring Schedule
(Adobe PDF)
-
Last 2 Weeks
Schedule (MS Word)
-
Winter Schedule
(Adobe PDF)
- Customer Needs
-
Product
Specifications Agreement (MS Word)
-
Product
Specifications Agreement (MS Word)
- BOM & Budget
-
Budget,
Bill of Materials (5-11-2007)(MS Excel)
-
Budget,
Bill of Materials (5-11-2007)(MS Excel)
- Risk Assessment
-
Risk
Assessment - During Production (MS Excel)
-
Risk Assessment - Post Production - In Progress
(MS Excel)
-
Risk
Assessment - During Production (MS Excel)
- Manuals
-
Touch
Screen/LCD (Adobe PDF)
-
Single Board
Computer (Adobe PDF)
-
Single
Board Computer CPU (Adobe PDF)
-
Flash Drive (Adobe
PDF)
-
Battery (Adobe PDF)
-
Battery
Charger (External Link)
-
Battery Casing2
(Adobe PDF)
-
DC-DC Converter
(Adobe PDF)
-
Software
Developer/Programmer's Guide (MS Word)
-
Touch
Screen/LCD (Adobe PDF)
- Tech Paper
-
Tech Paper
Outline (MS Word)
-
Tech Paper (MS
Word)
-
Appendices (MS Word)
-
Tech Paper
Outline (MS Word)
- Poster
-
Poster 5-9 (Adobe PDF)
-
Poster 5-9 (Adobe PDF)
- User Manual
-
User
Manual w/Table of Contents (MS Word)
-
User
Manual w/Table of Contents (MS Word)
Design Review Packets
Two times per quarter we hold a design review to show the progress we have made on the project. Below are the packets of documentation associated with each review:- Senior Design I
-
Fall Week 7
Review (Adobe PDF)
-
Fall Week 9
Review (Adobe PDF)
-
Fall Final
Review (Adobe PDF)
-
Fall Week 7
Review (Adobe PDF)
- Senior Design II
-
Spring Week 2
Review(Adobe PDF)
-
Spring
Week 2 Action Items (MS Word)
-
Spring
Performance Review Rubric (MS Word)
-
Pictures
-
Spring Week 2
Review(Adobe PDF)
Sub-System Pages
Below are pages for each sub-system of our project that are created & run by each of the sub-system leads.Mechanical Sub-system
Industrial & System Sub-system
Software Sub-system
Embedded Hardware Sub-system
Component & Product Sub-system
Wiki Help
Please use this link to send e-mail to other teams/members in the Trak
- Choose the Trak number(P07000 or individual team number P0700x)
Use this link to edit your upload/links (without having to deleting the and re-creating it.)
- Edit by selecting the link name used.
| Click here to go back to the Assistive Device Track Home node |