P08456: Underwater Light
/public/

Required Resources

Describe resources necessary to support successful Development, Implementation and Utilization of the project. This would include specific faculty expertise for consulting, required laboratory space and equipment, outside services, customer facilities, etc. Indicate if required resources are available.

Faculty
Item Source Description Available
Dr. Ed Hensel ME Customer Yes
Dr. Philips EE Technical Consultant Yes
Dr. Reddy CE Technical Consultant Yes
Dr. Emmett Ientilucci CIS Technical Consultant Yes
Dr. Anthony Vodacek CIS Technical Consultant Yes
John Bonzo Brinkman Lab Technical Consultant Yes
Environment
Item Source Description Available
Robotics Lab ME 09-2230 Work Space/Storage Yes
Sr Design Lab EE 09-3xxx Work Space Yes
ME Shop ME 09-2360 Parts Fabrication Yes
Equipment
Item Source Description Available
Light Metering Equip. Dept. for Imaging Arts & Sciences Qualification Testing Yes
Power-supply EE Department Used for Testing Yes
Desktop PC Throughout Programming Yes

The team members will be expected to procure the materials needed for the project, excluding the following:

Materials
Item Source Description Available
Super Droid Robot ATR Teaching Assistant 10kg payload example Yes
IFI Robotics Kit Teaching Assistant 100kg payload example Yes