P10056: System to Collect Side Stream Smoke (side stream
smoke collection system)
/
public - Directory contents
| Subdirectories | |||
|---|---|---|---|
| Feasibility Sorbent Tube | display | ||
| Frame pipe | display | ||
| Files | |||
| Action Items | display | ||
| BOM 1 | display | ||
| BOM 2 | display | ||
| BOM 3 | display | ||
| BOM 4 | display | ||
| BOM for future references | display | ||
| Bag Collection Test | display | ||
| Bag Test | display | ||
| Base | display | ||
| Batelle SOPs | display | ||
| Block Diagram | display | ||
| Block Diagram based on Design 5 | display | ||
| Bracket | display | ||
| Bracket (D) | display | ||
| Bracket Bolt | display | ||
| Bracket Bolt (D) | display | ||
| CAD Drawings | display | ||
| CORESTA TF Questionairres | display | ||
| CORESTA Task Force Meeting in Paris | display | ||
| Cataloging Parts | display | ||
| Chimney | display | ||
| Chimney & Impinger Holder | display | ||
| Chimney Holder (D) | display | ||
| Chimney Options | display | ||
| Cigarette Holder | display | ||
| Cigarette Holder (D) | display | ||
| Clamping Test | display | ||
| Coffee Can | display | ||
| Coffee Can (D) | display | ||
| Complete Assembly | display | ||
| Complete System | display | ||
| Concept Development | display | ||
| Coresta Recommended N54 | display | ||
| Coresta Recommended N55 | display | ||
| Cork | display | ||
| Customer Constraints | display | ||
| Customer Needs Sheet | display | ||
| DDR Package | display | ||
| Dave's | display | ||
| Design 1 | display | ||
| Design 2 | display | ||
| Design 3 | display | ||
| Design 4 | display | ||
| Design 5 | display | ||
| Detail Design | display | ||
| Determination of CO in SS Smoke | display | ||
| Determination of Nicotine in MS & SS Smoke | display | ||
| Determination of Tar, Nicotine, & CO in sidestream smoke | display | ||
| Dimensions | display | ||
| Dimensions of the 3Ds | display | ||
| Engineering Specification | display | ||
| Equations | display | ||
| Establish Target Specifications | display | ||
| Feasibility Analysis | display | ||
| Feasibility Analysis 1 | display | ||
| Feasibility Analysis 2 | display | ||
| Feasibility Analysis 3 | display | ||
| Feasibility Analysis 4 | display | ||
| Feasibility Analysis 5 | display | ||
| Feasibility Cambridge Filter Holder | display | ||
| Feasibility Chimney | display | ||
| Feasibility Tube | display | ||
| Filter Test | display | ||
| Final Design Review | display | ||
| Final System Level Review Presentation | display | ||
| Frame | display | ||
| Frame Connection | display | ||
| Frame Pipe (D) | display | ||
| Gantt Chart | display | ||
| Gas Bag (D) | display | ||
| General Block Diagram | display | ||
| General Design | display | ||
| Generate Product Concepts | display | ||
| Grading and Assessment Scheme | display | ||
| HELP | display | ||
| HOQ | display | ||
| Health Canada Amino | display | ||
| Health Canada Cyanide | display | ||
| Health Canada Metal | display | ||
| Health Canada Nicotine | display | ||
| Health Canada organic | display | ||
| Help Document- Tim | display | ||
| Home | display | ||
| How to Add A Simple Document to your website | display | ||
| ISO 3308 | display | ||
| Identify Customer Needs | display | ||
| Impinger | display | ||
| Impinger Clamp (D) | display | ||
| Impinger Test | display | ||
| Inner Tube | display | ||
| Intellectual Property Considerations | display | ||
| Latest BOM | display | ||
| Lighting Test | display | ||
| MSD 2 Plan | display | ||
| MSD Weekly Plan | display | ||
| Main Cambridge Filter | display | ||
| Main Cambridge Filter (D) | display | ||
| Main Tubing | display | ||
| Mass Flow Test | display | ||
| Methodology of analysis of Tar, Nicotine, & CO in SS Smoke | display | ||
| Mission Statement | display | ||
| Operational Manual | display | ||
| Outer Tube | display | ||
| Overall Test | display | ||
| Overview | display | ||
| PPTx Part 1 | display | ||
| PPTx Part 2 | display | ||
| PRP 10056.doc | display | ||
| Part 1 | display | ||
| Part 2 | display | ||
| Part 3 | display | ||
| Part 4 | display | ||
| Philip Morris Projects | display | ||
| Planning | display | ||
| Preliminary Work Breakdown Structure | display | ||
| Presentation Week 4 | display | ||
| Pressure Drop Test | display | ||
| Program Test | display | ||
| Rail | display | ||
| Rail (D) | display | ||
| Recovery of Imidacloprid, in Tobacco Smoke | display | ||
| Required Resources | display | ||
| Risk Assessment | display | ||
| Sample of Mainstream & Sidestream Filters | display | ||
| Saran Gas Bag | display | ||
| Select Product Concept(s) | display | ||
| Set Final Specifications | display | ||
| Shamal's | display | ||
| Sidestream & Mainstream Collected Data | display | ||
| Slider | display | ||
| Slider (D) | display | ||
| Sorbent Tubes | display | ||
| Staffing Requirements | display | ||
| System Diagram 1 | display | ||
| System Diagram 2 | display | ||
| System Diagram 3 | display | ||
| System Diagram 4 | display | ||
| System Diagram 5 | display | ||
| System Level Design | display | ||
| System Level Review Agenda | display | ||
| System Level Review Presentation | display | ||
| Team Evaluation MSD II | display | ||
| Team Picture | display | ||
| Team Poster | display | ||
| Team Research Summary | display | ||
| Team Values and Norms | display | ||
| Technical Paper | display | ||
| Tee Joint | display | ||
| Test Product Concept(s) | display | ||
| TestFile.jpg | display | ||
| Testing and Refinement | display | ||
| Tim's | display | ||
| Tim's Action Items | display | ||
| Tubing Test | display | ||
| Vacuum Pump | display | ||
| Week 1 Progress Report | display | ||
| Week 2 Progress Report | display | ||
| Week 3 Progress Report | display | ||
| Week 4 Progress Report | display | ||
| Week 5 Progress Report | display | ||
| Week 6 Progress Report | display | ||
| Week 7 Progress Report | display | ||
| Week 8 Progress Report | display | ||
| lighter | display | ||