Welcome to P10712: Wegmans 2 Process Improvement
| Project Summary | Project Information |
|---|---|
|
Wegmans is a private, family-owned corporation that operates approximately 47 supermarkets, with their headquarters in Rochester, NY. In 1950, the son of the founders of Wegmans, Robert Wegman became president of Wegmans stores, and the company began to invest in businesses that would enhance its central focus. Wegman acquired an egg farm and developed an on-site meat processing center and a central bakery. The central bakery is still in the same location, while the Meat Process Center (CIC) has recently moved. The aim of this MSD project is to improve the Cheesecake Bakery Process in the Central Bakery Facility in Rochester, NY. The central bakery provides the baked goods for all the Wegmans stores. Specifically, the cheesecake process has some process problems, as well as a need for updated techniques to more efficiently make the cheesecake. Improving the Cheesecake making process and providing the workers with more ergonomically correct and efficient methods will increase throughput of the cheesecakes. This will enable Wegmans to deliver the product to the customer in the most cost effective way. (all images provided by wegmans.com) |
|
MSD I Document Quick Links
Week 1
Mission StatementIntellectual Property Considerations
Preliminary Work Breakdown Structure
Week 2
Required ResourcesWeek 3
Identify Customer NeedsWeek 4
Fishbone Diagram - Defining our System (.vsd)Overall Cheesecake Value Stream Map (.vsd)
Establish Target Specifications
Week 5
System level Design Review last updated: 10/08/09System Design Review Revisions (Review Notes)
Week 6
Post System Level Design Review AID Log (.xls)Updated MSD I Project Plan (.mpp)
Revised Concept Selection Criteria Post System Level Design Review (.xlsx)
Week 7
Pre Tunnel Oven Time Stamps, 10-18-09
Assisted Water Pouring Unit Overview Doc
Updated Risk Analysis (.xlsx) (10/23/2009)
Current State Pre-Tunnel Oven (.mpp) 10/23/2009
Tunnel Oven - Updated Customer Needs 10/23/2009
MSD I Project Plan (.mpp)(10/24/2009)
Week 8
Tunnel Oven - Customer Needs and Engineering Metrics Chart (.xlsx)
Tunnel Oven - Engineering Specs (.docx)
Detailed Process Flow Diagram, VSM
Overall Process Flow Diagram (MS Visio)
Overall Process Flow Diagram with Detailed Process Instructions (MS Word 2007)
Sheet Pan Data Analysis (.xls)
Small Sheet Pan Drawing (.pdf)
Large Sheet Pan Drawing (.pdf)
Kaizen Event Plan for Depanning Process (Held Week 1 of MSD II)
Preliminary MSD II Project Plan last updated 11/5/2009
Week 9
Detail Design Review Presentation last updated 11/5/09Detail Design Handout last updated 11/6/09
Week 10
Updated Tunnel Oven - Engineering Specs (.docx)
Test Plans
Proposal 1: Marble Cheesecake PI
Proposal 2: AWP-Unit Test Plan
Proposal 3: Increased TH, Kaizen Event
Proposal 4: New Pans Test Plan