Subdirectories | |||
---|---|---|---|
Documents | display | ||
MSD I Deliverables | display | ||
MSD II Deliverables | display | ||
Files | |||
Action Items 1 | display | ||
Action Items List | display | ||
CTQ | display | ||
Current Prototype Design (back).jpg | display | ||
Current Prototype Design (old).jpg | display | ||
Current Prototype Design.jpg | display | ||
DDR Action Items | display | ||
Design Review Packet 1 | display | ||
Design Review Packet 2 | display | ||
Detailed Design Review Documents (SD I) | display | ||
Engineering Specifications | display | ||
Essay | display | ||
FMEA Design Level | display | ||
FMEA System Level | display | ||
Final Design.jpg | display | ||
Final Power Point Presentation | display | ||
Front Plate RIT Logo.jpg | display | ||
Front View.jpg | display | ||
Home | display | ||
Interface Control Document | display | ||
Interfact Control Document | display | ||
Iso View.jpg | display | ||
LVE Budget | display | ||
LVE Mass Production Budget | display | ||
LVE Prototype Budget | display | ||
Lesson's Learned Budget Analysis | display | ||
Lesson's Learned Packet | display | ||
MSD I Project Plan | display | ||
Poster | display | ||
Preliminary Work Breakdown Structure | display | ||
Project Schedule | display | ||
Project Schedule 2 | display | ||
QFD | display | ||
Quantity Breakdown | display | ||
Schedule for MSD II | display | ||
Solidworks Analysis | display | ||
System Analysis | display | ||
System Architecture | display | ||
System Assembly Plan | display | ||
System Customer Needs | display | ||
System Level Specifications | display | ||
System Mission Profile | display | ||
System Project Summary | display | ||
System Team Documentation | display | ||
Team Values and Norms | display | ||
Test Plan | display | ||
Top View.jpg | display |