System Team Members
Michael Deyhim
E-Mail: mdeyhim0913@hotmail.com
Phone: 1-607-342-6651
Megan Ott
E-Mail: meo5617@rit.edu
Phone:
System Team Documentation
Updated: 1/28/2011 Version: 2.0
The project summation with the history and overview of the LVE and it's project family.
System Mission Profile
Updated: 2/17/2011 Version: 3.0
A day in the life of the LVE. To help figure out what the LVE will be used for and to drive energy and use calculations.
Updated: 1/14/2011 Version: 1.0
How the various components of the LVE come together and interact.
Updated: 1/14/2011 Version: 1.0
The customer needs that have a direct impact on the systems level of the LVE.
Updated: 2/17/2011 Version: 5.0
System level specs derived from the customer needs.
Updated: 2/20/2011 Version: 4.0
A house of quality showing the importance and interactions between the Engineering Specifications and Customer Needs.
Updated: 5/14/2011 Version: 4.0
A risk analysis of system level risks from the top down of the LVE project.
Updated: 5/6/2011 Version: 3.0
A risk analysis of system level risks from the bottom down of the LVE project.
Updated: 5/13/2011 Version: 4.0
A plan detailing how to test the various system specifications.
Updated: 5/13/2011 Version: 2.0
An outline on how customer demands are focused downwards onto the design. It is a summarized after the fact version of the various components developed from part 1 of the MSD course.
Updated: 5/9/2011 Version: 1.0
An outline on how to assemble the various areas of the project level. A number of the connections involve power distribution and how the controls are based.
Updated: 5/13/2011 Version: N/A
A posted Interface Control document from the google docs, should not be taken as the most up to date version.
Updated: 5/6/2011 Version: 6.0
A posted summary of the budgets of all the LVE teams.
Updated: 5/13/2011 Version: 2.0
Updated: 5/6/2011 Version: 2.0
The current progress of the System Level team and future tasks.
Updated: 2/21/2011 Version: 4.0
Updated: 5/6/2011 Version: 5.0
The current progress of the System Level team and future tasks.
Final Power Point Presentation
The Design Review Packets the System Team used to present with.
Lesson's Learned Budget Analysis
The suggestions from all the teams and budget analysis on what to change for future LVE projects.
Updated: 2/18/2011
Action items that the System Team is working to complete.
Team Links
Team 11211 Chassis https://edge.rit.edu/content/P11211/public/Home
Team 11212 Control https://edge.rit.edu/content/P11212/public/Home
Team 11213 MSA https://edge.rit.edu/content/P11213/public/Home
Document Control https://edge.rit.edu/content/P11211/public

