System Project Summary

Updated: 1/28/2011 Version: 2.0

The project summation with the history and overview of the LVE and it's project family.


System Mission Profile

Quantity Breakdown

Updated: 2/17/2011 Version: 3.0

A day in the life of the LVE. To help figure out what the LVE will be used for and to drive energy and use calculations.


System Architecture

Updated: 1/14/2011 Version: 1.0

How the various components of the LVE come together and interact.


System Customer Needs

Updated: 1/14/2011 Version: 1.0

The customer needs that have a direct impact on the systems level of the LVE.


Engineering Specifications

Updated: 2/17/2011 Version: 5.0

System level specs derived from the customer needs.


QFD

Updated: 2/20/2011 Version: 4.0

A house of quality showing the importance and interactions between the Engineering Specifications and Customer Needs.


FMEA System Level

Updated: 5/14/2011 Version: 4.0

A risk analysis of system level risks from the top down of the LVE project.

FMEA Design Level

Updated: 5/6/2011 Version: 3.0

A risk analysis of system level risks from the bottom down of the LVE project.


Test Plan

Updated: 5/13/2011 Version: 4.0

A plan detailing how to test the various system specifications.


CTQ

Updated: 5/13/2011 Version: 2.0

An outline on how customer demands are focused downwards onto the design. It is a summarized after the fact version of the various components developed from part 1 of the MSD course.


System Assembly Plan

Updated: 5/9/2011 Version: 1.0

An outline on how to assemble the various areas of the project level. A number of the connections involve power distribution and how the controls are based.


Interface Control Document

Updated: 5/13/2011 Version: N/A

A posted Interface Control document from the google docs, should not be taken as the most up to date version.


LVE Prototype Budget

LVE Mass Production Budget

Updated: 5/6/2011 Version: 6.0

A posted summary of the budgets of all the LVE teams.


Essay

Updated: 5/13/2011 Version: 2.0

Poster

Updated: 5/6/2011 Version: 2.0

The current progress of the System Level team and future tasks.


Project Schedule

Updated: 2/21/2011 Version: 4.0

Project Schedule 2

Updated: 5/6/2011 Version: 5.0

The current progress of the System Level team and future tasks.


Design Review Packet 1

Design Review Packet 2

Final Power Point Presentation

The Design Review Packets the System Team used to present with.


Lesson's Learned Packet

Lesson's Learned Budget Analysis

The suggestions from all the teams and budget analysis on what to change for future LVE projects.


DDR Action Items

Updated: 2/18/2011

Action items that the System Team is working to complete.

Team 11211 Chassis https://edge.rit.edu/content/P11211/public/Home


Team 11212 Control https://edge.rit.edu/content/P11212/public/Home


Team 11213 MSA https://edge.rit.edu/content/P11213/public/Home


Document Control https://edge.rit.edu/content/P11211/public