Overall Data Sheet

Work Breakdown Structure

Facet 1: Needs Assessment
Facet 2: Concept Development
Facet 3: Feasibility Assessment
Facet 4: Design Objectives and Performance Specifications
Facet 5: Analysis of Problems
Facet 6: Preliminary Design
Final Design: Cap
Final Design: Lid Movement
Final Design: Dual Hose Filling and Flow
Final Design: Safe Advancement
Final Presentation