Week 3 Work Breakdown Structure:

 

Task

Team Member

Deadline

Expected Time

Complete Digikey order

Assemble, test and tune Chua’s Circuit.

Research Printed Circuit Board fabrication, cost, and lead time.  Acquire software to develop PCB layout.

Work with James testing magnets for Oscillator, redesign as necessary.

Attend Lab View seminar conducted by National Instruments engineer.

Joe

3/28/04

8 hours

Working in machine shop fabricating components for the three devices

Collect remaining screws, washers, and nuts.  Determine what modifications will be required to adapt components to desired sizes

Turn in completed requisition form with receipts to be reimbursed.

Work with Joe testing magnets for Oscillator, redesign as necessary.

James

3/28/04

8 hours

Working in machine shop fabricating components for the three devices

Collect components from Lowe’s and Wal-mart.

Assembly of Waterwheel Flow Chamber.

Update CAD drawings as required and print drawings to be used during fabrication.

Attend Lab View seminar conducted by National Instruments engineer.

Jeremy

3/28/04

8 hours

Working in machine shop fabricating components for the three devices.

Develop experimentation procedures to be used to validate equipment and determine critical parameters.

Become familiar with strain gage mounting procedures.

Attend Lab View seminar conducted by National Instruments engineer.

Ashley

3/28/04

8 hours

Working in machine shop fabricating components for the three devices.

Meet with Customer to discuss progress of project

Determine components that must be ordered.  Place orders.

Andrew

3/28/04

8 hours