Week 5 Work Breakdown Structure:

 

Task

Team Member

Deadline

Expected Time

Assemble, test and tune Chua’s Circuit.

Research Printed Circuit Board fabrication, cost, and lead time.  Acquire software to develop PCB layout.

Begin fabrication of electrical subassemblies.

Joe

4/11/03

8 hours

Working in machine shop fabricating components for the three devices.

Modify bolts as required to allow for them to be used in our devices.

Develop method for mounting electric motor on Multi-well Oscillator.

James

4/11/03

8 hours

Working in machine shop fabricating components for the three devices

Assembly of Waterwheel Flow Chamber.

Update CAD drawings as required and print drawings to be used during fabrication.

Jeremy

4/11/03

8 hours

Working in machine shop fabricating components for the three devices.

Continue working on experimentation procedures.

Practice mounting strain gages.

Ashley

4/11/03

8 hours

Working in machine shop fabricating components for the three devices.

Research, order, and acquire rare earth magnets to be used in the Multi-well Oscillator

Determine components that must be ordered.  Place orders.

Andrew

4/11/03

8 hours