This project is a lightweight clipboard-size device that will easily allow a blind person to record, and play back, at least 64 audible memoranda messages with categories such as Appointments, Special Dates, To-Do List, and etc. The user interface must be simple and easily navigated by sense of touch. The design must assume that the user suffers some degree of neuropathy in the fingertips.

Staffing
Team Member Discipline Role email address
George Slack EE Guide gbseee@rit.edu
Tala Hopkins Sponsor Customer talamark@rochester.rr.com.
Mark Hopkins EE EE Consultant maheee@rit.edu
Roy Melton CE EE Consultant rwmeec@rit.edu
Wayne Walter ME ME Consultant wwweme@rit.edu
Joel Forman ME Team Member jcf1450@rit.edu
Luis Piedrahita ISE Team Member lfp5721@rit.edu
Drew McLean CE Team Member asmclean@mail.rit.edu
Andrew Crecca EE Team Member awc4155@rit.edu
Zebo Qiu EE Team Member zxq7663@rit.edu

Mission Statement

The mission of this project is to develop a lightweight, clipboard-size device that will easily allow a blind person to record, and play back, at least 64 audible memoranda.

The interface must be simple, and easily navigated by sense of touch. The design must assume that the user suffers some degree of neuropathy in the fingertips.

There must be at least sixty seconds of available record-time for each memo.

For example, the face of the device could be organized as a grid of 20 boxes, demarcated by raised lines or ridges that are easily felt. Sixteen of the boxes could be numbered memos, and the other four boxes could select among categories of memo (such as Appointments, Special Dates, To-Do List, etc.). By selecting a category, the sixteen memos in that category would be accessible.

Project Readiness Package

The Project Readiness Page defines customer needs and expectations, project deliverables (including time frame), budget, and personnel / organizations affiliated with the project. It will serve as the primary source of information for students necessary during Phase 0 (Planning) to develop a SD I plan and schedule including specific deliverables and due dates. The Project Readiness Package will also support Faculty evaluation of project suitability in terms of depth, scope, and student / faculty resources by discipline.

Project Planning

Needs Statement 01-24-07

Websites of Interest

1 Page Project Summary 12/14/06

Roles and Responsibilities 12/14/06

Engineering Specifications 1-24-07 XLS

Additional Engineering Specifications XLS

Team Schedule 01-24-07 R2 XLS

Team Schedule 02-01-07 R3 XLS

Team Schedule 02-22-07 R4 XLS

Concept Peer Review Minutes

SDII Plan

Concept Development

Concept Review PreRead

Project Review

Project Review Slides

Weekly Meetings

What to bring Week 6 1-26-07

What to bring Week 7 2-2-07

Issue Tracking 1-26-07 XLS

Meeting Notes 1-26-07

Meeting Notes 2-2-07

Meeting Notes 2-9-07

Meeting Notes 2-23-07

Meeting Notes 3-1-07

Meeting Notes 3-16-07

Customer Prototype 3-30-07

Meeting Notes 4-27-07

Preliminary Design Synthesis

Drawing Package Rev 1

Mechanical BOM with Website Prints Rev 1

Complete BOM XLS

Color Prints Rev 1

Electrical Technical Design

Pre-Amp Design Circuitry

Design Review 2

Drawing Package Rev 2

Heat Analysis Results

Heat Analysis Calculator XLS

BOM 3-23-07

Design Schematic

Final Documents

Conference Paper 07306

Conference Paper Ammendment 07306

Poster 07306 (.ppt)

Final Drawing Package 07306 (.pdf)

Flow Charts

User Guide

Keyboard Ribbon Cable Diagram (.xls)

Pro Engineer Files (.zip)

Final Schematic

Final BOM (.xls)

Clock Chip Specification

Clock Chip Psuedo-code

Images

Picture File 1 (.zip)

Picture File 2 (.zip)