Grade Level | MSD I | MSD II |
---|---|---|
D (minimum acceptable level) | No deliverables were submitted except for a 3D model of the Parallel Bar (PB) system and obstacle course with a finalized list of customer needs. | Builds only one upright system. |
C | The team has delivered all elements of Level D PLUS: Stress analysis and fatigue analysis were performed for critical components of the PB system and obstacle courses. | The team builds an adjustable obstacle course and 4 uprights with one controller that changes heights for both bars. |
B | The team has delivered all elements of Level D and Level C PLUS: Justified selection of materials to use for critical components of the PB system and obstacle course. | Builds an adjustable course with variable challenges (easy to hard) and 6 uprights with one controller that changes heights for both parallel and also controls individual bar heights. The team has also included an auditory/visual sensor to the system. Completed the testing of critical components. |
A | The team has delivered all elements of Level D Level C, and Level B PLUS: A detailed test plan, a BOM list, and a finalized model of the prototype is prepared for Senior Design II. | The team has delivered all elements of Level B PLUS: Both PB system and obstacle course has met customer needs and installed for customer use. |
Home | Planning | Concept Development | System Level Design | Detail Design | Testing and Refinement