P08027: Wireless Assistive Control System
/public/

MSD1 Work Breakdown Structure

Preliminary Work Breakdown Structure

The 11 week flow charts can be found below for each team member.


Grading based on work from SD1 Grading and Assessment Scheme


Home | Planning | Concept Development | System Level Design | Detail Design | Testing and Refinement | Product Development Costs