P08203: DC Motor Dynamometer
/public/

Preliminary Work Breakdown Structure

Team Three Week Project Plan
Person Week 0->1 Tasks

(3 Sep 07)

Week 1->2 Tasks

(10 Sep 07)

Week 2->3 Tasks

(17 Sep 07)

Team
  • Review PRP
  • Determine individual Roles and Responsibilities
  • Meet with the customer and update customer needs
  • Begin reviewing and determining specific safety constraints
  • Complete first draft of One Page Summary doc.
  • Meet with Erin Gillespie and obtain previous design binder
  • Familiarize yourselves with the previous project
  • Finalize One Page Summary doc.
  • Complete engineering specifications and begin filling in the QFD matrix
  • Begin identifying and justifying critical sub-functions
  • Continue familiarizing yourselves with the previous project and begin determining the extent of modification/re-build
  • Begin concept generation (See sixth bullet point under Notes)
  • Complete QFD matrix
  • Developed a functional diagram of critical sub-functions
  • Summarize results of external and internal searches of problem solutions
  • Continue concept generation and begin refining concepts to a functional level. (See sixth bullet point under Notes)
ME Three Week Project Plan
Person Week 0->1 Tasks

(3 Sep 07)

Week 1->2 Tasks

(10 Sep 07)

Week 2->3 Tasks

(17 Sep 07)

ME Student 1
  • Research previous design, specifically structural and other mechanical components (i.e. structural features, application of mechanical load to motor, mounting of other components, coupling, etc.).
  • Begin benchmarking current dyno's and the platforms that support the motor and other components.
  • Determine what safety constraints pertain to the mechanical features
  • Begin getting familiar with 100kg and 10 kg motors
  • Assist in overall team deliverables
  • Continue benchmarking current dyno's
  • Determine the extent of mechanical modification/re-design of the previous design
  • Determine design parameters based off of customer needs (i.e. scalability)
  • Begin concept generation
  • Assist in overall team deliverables
  • Summarize external and internal searches to be presented to the team
  • Continue concept generation and begin refining concepts
  • Communicate with EE's to develop concepts for obtaining required motor characterization parameters
  • Assist in overall team deliverables
ME Student 2
  • Research previous design, specifically structural and individual component FEA analysis
  • Begin benchmarking current dyno's and the platforms that support the motor and other components.
  • Determine what safety constraints pertain to the mechanical features
  • Begin getting familiar with 100kg and 10 kg motors
  • Assist in overall team deliverables
  • Continue benchmarking current dyno's
  • Assist in determining the extent of mechanical modification/re-design of the previous design
  • Determine design parameters based off of customer needs (i.e. scalability)
  • Begin concept generation
  • Assist in overall team deliverables
  • Summarize external and internal searches to be presented to the team
  • Continue concept generation and begin refining concepts
  • Provide structural and mechanical component FEA analysis
  • Assist in overall team deliverables
ME Student 3
  • Research previous design, specifically power train analysis
  • Begin benchmarking current dyno's. Focus on transmission theory, power train analysis, and resistance to vibration
  • Determine what safety constraints pertain to the mechanical features
  • Begin getting familiar with 100kg and 10 kg motors
  • Assist in overall team deliverables
  • Continue benchmarking current dyno's
  • Assist in determining the extent of mechanical modification/re-design of the previous design
  • Determine design parameters based off of customer needs (i.e. scalability)
  • Begin concept generation
  • Assist in overall team deliverables
  • Summarize external and internal searches to be presented to the team
  • Continue concept generation and begin refining concepts
  • Provide transmission theory, power train analysis, and knowledge of engineering vibrations to assist in the design
  • Assist in overall team deliverables
EE/CE Three Week Project Plan
Person Week 0->1 Tasks

(3 Sep 07)

Week 1->2 Tasks

(10 Sep 07)

Week 2->3 Tasks

(17 Sep 07)

EE Student 1
  • Research previous design, specifically the electrical design and theory
  • Begin benchmarking current dyno's with focus on dynamometer measured parameters.
  • Begin getting familiar with 100kg and 10 kg motors
  • Determine what safety constraints pertain to the electrical features
  • Assist in overall team deliverables
  • Continue benchmarking current dyno's
  • Assist in determining the extent of electrical modification/re-design of the previous design
  • Work with ME's to begin concept generation
  • Assist in overall team deliverables
  • Summarize external and internal searches to be presented to the team
  • Continue concept generation and begin refining concepts
  • Communicate with ME's to develope concepts for obtaining required motor characterization parameters
  • Assist in overall team deliverables
EE/CE Student 2
  • Research previous design, specifically the user interface software and I/O into the software
  • Begin benchmarking current dyno's with focus on dynamometer measured parameters and user interface software
  • Determine what safety constraints pertain to the electrical features
  • Assist in overall team deliverables
  • Continue benchmarking current dyno's
  • Assist in determining the extent of user interface modification/re-design of the previous design
  • Work with ME's to begin concept generation
  • Assist in overall team deliverables
  • Summarize external and internal searches to be presented to the team
  • Continue concept generation and begin refining concepts
  • Communicate with ME's to develop concepts for obtaining required motor characterization parameters
  • Assist in overall team deliverables
EE Student 3
  • Research previous design, specifically the PCB design
  • Learn how the previous PCB board got damaged
  • Begin benchmarking current dyno's with focus on dynamometer measured parameters and sensing techniques
  • Determine what safety constraints pertain to the electrical features
  • Assist in overall team deliverables
  • Continue benchmarking current dyno's
  • Assist in determining the extent of PCB modification/re-design of the previous design
  • Work with ME's to begin concept generation
  • Assist in overall team deliverables
  • Summarize external and internal searches to be presented to the team
  • Continue concept generation and begin refining concepts
  • Communicate with ME's to develop concepts for obtaining required motor characterization parameters
  • Assist in overall team deliverables

Planning

Mission Statement

Staffing Requirements

Intellectual Property Considerations

Preliminary Work Breakdown Structure

Team Values and Norms

Grading and Assessment Scheme

Required Resources

Notes

Concept Development

Identify Customer Needs

Establish Target Specifications