P08452: Fault Detectioin in Rotating Equipment for Energy Industry
/public/

Detailed Design Review, Feb 15 2008

Documents to Present

Detailed Design Review, Feb 15, 2008

Work in Process

Senior Design II - Detailed Timeline

Senior Design II - General Timeline

Draft 1 - O&M Manual

Log Sheets

Presentation Calculations (02-15-08)

Electrical Wiring (02-14-08)

Installation Procedure (02-15-08)

Installation Overview (02-25-08)

ANSYS Structural Calculation(02-14-08)

Bill of Materials