P08452: Fault Detectioin in Rotating Equipment for Energy Industry
/public/

EE or CE 2 Tasks 3

Week 3

note: All work will be documented in some type of engineering logbook.

Preliminary Work Breakdown Structure

Home | Team Documents | Planning | Concept Development | System Level Design | Detail Design | Testing and Refinement