P08452: Fault Detectioin in Rotating Equipment for Energy Industry
/public/

Set Final Specifications

Table of Contents

Step 1. Develop Technical Models of the Project

Technical models of the product have been focused on during presentations throughout the following documents:

Concept Review Jan 18th

Agenda for System Review Feb 1st

Detailed Design Review, Feb 15, 2008

Step 2. Develop a Cost Model of the Project

The Bill of Materials shown is all parts, components, and services that have been identified in the designs developed for the Compressor Installation, Revamp, and Interface.

Bill of Materials

Step 3. Refine the Specifications, Making Tradeoffs Where Necessary

The following link provides a finalized set of relationships between the determined customer needs and the targeted engineering specifications.

Quality Function Deployment Feb 22nd

Step 4. Reflect on the Results and the Process

The process of specification setting has undergone several steps from original concepts to final design determinations, and changes have been based upon the extremely beneficial and continual communication that has been open between Dresser-Rand representatives and the student team. The bi-weekly reviews have allowed the team to process discussions with the customers at Dresser-Rand, to conduct design calculations and testing procedures, and then to present again the results to ensure that both parties were continually updated with similar understandings of the project. The QFD table provided in the link above is a culmination of these results.