The staffing requirements for the project are summarized in the table below.
Name | Discipline | Role / Skills |
---|---|---|
Marcos Esterman | ISE | Faculty Guide, Will work closely with the team on an on-going basis to facilitate success. |
Juan Cockburn | EE | Faculty Consultant, Will provide EE discipline technical support on an intermittant basis. |
Nikhil Kaushal | EE | Software design and user interface design this needs to be common between the existing test bed and the one that the team will develop. This may require a S/W translation layer to make that possible. Coordinate team through planning. |
Arjun Sachdeva | EE | Control HW and Sensor Design and Implementation for the roller based system. Coordinate team through scheduling. |
Abdul Haleem Syed | EE | Control System design -- there will be opportunities to develop a control system for the roller-based system and assist in the remaining tasks for the current system. Coordinate team through recording and posting meeting minutes. |
Daniel O'Connell | ME | Overall system design and integration, component fabrication and assembly, test and validation plan and execution. General team coordination and EDGE webmaster |
Nate Po | ME | Handle the overall mechanical design and hardware implementation of the roller systems, motors, supporting structures and enclosures, etc. Coordinate team through budget planning and control. |
Home | Planning | Concept Development | System Level Design | Detail Design | Testing and Refinement