Staffing Requirements

The staffing requirements for the project are summarized in the table below.

Staffing
Name Discipline Role / Skills
Marcos Esterman ISE Faculty Guide, Will work closely with the team on an on-going basis to facilitate success.
Juan Cockburn EE Faculty Consultant, Will provide EE discipline technical support on an intermittant basis.
Nikhil Kaushal EE Software design and user interface design this needs to be common between the existing test bed and the one that the team will develop. This may require a S/W translation layer to make that possible. Coordinate team through planning.
Arjun Sachdeva EE Control HW and Sensor Design and Implementation for the roller based system. Coordinate team through scheduling.
Abdul Haleem Syed EE Control System design -- there will be opportunities to develop a control system for the roller-based system and assist in the remaining tasks for the current system. Coordinate team through recording and posting meeting minutes.
Daniel O'Connell ME Overall system design and integration, component fabrication and assembly, test and validation plan and execution. General team coordination and EDGE webmaster
Nate Po ME Handle the overall mechanical design and hardware implementation of the roller systems, motors, supporting structures and enclosures, etc. Coordinate team through budget planning and control.