P09023: Air Muscle Artificial Limb Next Generation
/public/

Week 04 -- 2008.09.26

Due BEFORE Friday

Due DURING Friday



WEEK 04: TEAM ROLES

Jim
Generate Schedule for Week 4/5
Get Solidworks in Bioengineering lab
Gather Air Muscle Data
Meet with Roessel about Controls
Look into ordering air muscle parts
Alex
Finalize Solidworks Drawings (Fingers and Thumb)
Create Assembly Drawing
Chris
Finalize Solidworks Drawings (Fingers and Thumb)
Create Assembly Drawing
Eva
Complete Bill of Materials
Meet with Roessel about Controls
Help guide Chappy with his assignments
Kelly
Finalize Solidworks Drawings (Fingers and Thumb)
Create Assembly Drawing
Tommy
Complete Bill of Materials
Meet with other faculty/students to confer about Controls Design
Meet with Roessel about Controls