- Created a system architecture diagram for the presentation.
- Talked to Paul at MBA about the health check of the
current load cell.
- $50 unless something needs to be repaired then it is $100+parts.
- Created a preliminary winter quarter schedule with the other members of the team.
- Worked on and gave parts of presentation.