P09310: Automatic Shift Controls for ATV
/public/

Grading and Assessment Scheme

Deliverables
Grade Level MSD I MSD II
A Since this is a continuation project with added features and refinement, the team must become equally knowledgeable of technologies as last year's team as soon as possible. Concept design meets all customer needs and specifications. Prototyping is performed of each subsystem to gain technology and feasibility knowledge. Design reviews and concept selection process are fully documented on this EDGE site. Proof of concept completed including high-risk assessment. Test plan developed and documented. Product is fully functional, robust, and has undergone all testing. Team has successfully completed two fully system integrated test phases (i.e. test, redesign, test, redesign on the ATV) with robust field test results. All design reviews and performance results have been documented on EDGE website. Technical paper and poster are completed and submitted, all action items closed out. Results relayed to customer.
B Since this is a continuation project with added features and refinement, the team must become equally knowledgeable of technologies as last year's team as soon as possible. Concept meets expectations of high customer needs. Concept selection and design review is fully documented. Test plan in development. Risk assessment in development. Product is constructed and has undergone testing. Documents are submitted to EDGE website. Team has successfully completed two fully system integrated test phases (i.e. test, redesign, test, redesign on the ATV) with most field test results that are successful. All presentation materials are complete and design reviews complete, all action items closed out.
C Since this is a continuation project with added features and refinement, the team must become equally knowledgeable of technologies as last year's team as soon as possible. Concept meets some needs. Concept selected and all major documents and prototype information is documented on EDGE. Product constructed. Documents available on EDGE website. Team has successfully completed one fully system integrated test phases (i.e. test, redesign on the ATV) with most field test results being successful. Document outline of remaining action items to be addressed. Design reviews and presentations complete.
D Since this is a continuation project with added features and refinement, the team must become equally knowledgeable of technologies as last year's team as soon as possible. Customer needs not met. No documents on EDGE website. Concept no approved, design review unsatisfactory. Product construction not complete. No documentation. Design reviews incomplete, presentations incomplete.