P10459: Liner Cell Redesign and Relocation
/public/

Staffing Requirements

Staffing
Name Discipline Role / Skills
John Kaemmerlen ISE Faculty Guide, Will work closely with the team on an on-going basis to facilitate success.
Yi Xie ISE Develop visual controls to improve safety, productivity and quality of liner cell
Pete Lowry ISE Develop potential layouts that minimize travel distance in optimal cell layout
Alex Frenkel ME Determining optimal configuration of machines in terms of cost of buying vs. reusing or relocating current machines
Rachel Koch ME Develop material handling solutions to minimize defect during movement of liners
Phil Eaton ME Develop storage solutions to minimize travel time and space for WIP storage

Home