P10541: Micro-gloss Measurement System Improvements
/public/

Preliminary Work Breakdown Structure

Week 3 Week 4 Week 5
Team Begin concept generation - Begin system level design - Risk mitigation - Finalize customer needs and specs - Revise WBS - Risk mitigation System level design - Concept selection - Customer meeting - Risk mitigation System design customer review - Final system level design - Risk mitigation
Tim Salter (ME) Update EDGE website - Scheduling and planning - Hardware considerations Update EDGE - Scheduling and planning - Concept development - Hardware layout Update EDGE website - Scheduling and planning - Finalize system level hardware layout
Jason Smith (ME) Hardware concept generation - Benchmark existing device Start system analysis - Revise and narrow concepts - Start CAD drawings CAD drawings - Finalize system level hardware layout
Ahmed Alfadhel (EE) Understand the existing device functionality and investigate ways to minimize the work needed from the user - Search for an alternative camera (smaller easier to use and cheaper than the existing research camera) Design of needed electrical system and components - Design of the system hardware integration and automation Finalize the design of the system hardware integration and automation -Finalize electrical components wiring schematics -Finalize camera selection process
Mike Neurohr (CE) Start measurement procedure write-up - Plan data storage for control charts - Gather more details on what inputs to the programs can be standardized through construction or physical mechanisms Finish measurement procedure write-up on EDGE - Plan UI design with concepts (possible prototypes) - Investigate ways to link image capture and image analysis aspects of program Choose UI design (likely with John) and at least prototype it - Investigate ways to communicate with apparatus (for lens rotation/image capture/etc.)