P11022: VAD Reduction of Wired Content for Signal and Power Transmission
/public/

Task List Web Page

Table of Contents

Week One Task List

Yevgeniy Popovskiy Vince Antonicelli Craig LaMendola Chrystal Andreozzi

1. Order Components

2. Start assembly

3.Update individual BOM

1. Order Components

2. Start assembly

3.Update individual BOM

1.Start to Order Components

2. Analyze the electrical Components to help determine the sizing and spacing in the cases

1. Order Cable Components

2. Start Understanding what needs to be included in the Technical Paper and Start First Draft of Technical Paper

3. Determine meeting times for quarter

4. Document Everything that has been ordered and the prices in BOM (BOM Update)

5.Get Pictures from everyone for Edge

6. Start Understanding what needs to be included in the Poster and Start First Draft of Poster

7. At the end of the week determine if we are on schedule

8. Schedule a meeting with Team 11021 to talk about combining projects(goal is to make at least a connection every week with the other team)

Week Two Task List

Yevgeniy Popovskiy Vince Antonicelli Craig LaMendola Chrystal Andreozzi

1. Get internal and external Breadboards wired with chips

2. Order additional chips

3.Update individual BOM

1. Get internal and external Breadboards wired with chips

2. Order additional chips

3.Update individual BOM

1. Meet with Dr. Day to discuss the exact components he is providing

2. Take detailed measurements of these components and model them in solid works so they can be incorporated into the solid model of our cases.

3. Complete the order to Sealcon

1. Set up Meeting with other team

2. Order Cable Components and Connectors

3. Update Edge with task List and Pictures

4. Cont. Writing the Paper

5. Cont. Designing Poster

6. At the end of the week determine if we are on schedule

7.Document Everything that has been ordered and the prices in BOM (BOM Update)

Week Three Task List

Yevgeniy Popovskiy Vince Antonicelli Craig LaMendola Chrystal Andreozzi

1. Meeting with other team Tuesday from 3:45 to 4 p.m.

2. Test Breadboard in the Lab

3. Test external beadboard with oscilloscope

4. Test internal beadboard with oscilloscope

5. Finish internal beadboard

6. Order missing chips

7. Sauder the dac for external beadboard

8. Meeting with Craig to for case dimensions.

9.Update individual BOM

1. Finalized PCB board and order

2. Test Breadboard in the Lab

3. Test external beadboard with oscilloscope

4. Test internal beadboard with oscilloscope

5. Finish internal beadboard

6. Order missing chips

7. Sauder the dac for external beadboard

8. Meeting with Craig to for case dimensions.

1. Meeting with Vince and Yevgeniy to for case dimensions.

2. Modify solid model so customer provided electronics fit well.

3. Show design to electronic guys to ensure it looks good to them.

4-7 applies to internal and external cases

4. Get full specs/dimensions on chip we will make, and produce solid model

5. Modify solid model of case to ensure fit of our products

6. get electronics guys approval of fitment

7. Make prints of all components for quotation/production

8. Update individual BOM

1. Meeting with other team Tuesday from 3:45 to 4 p.m.

2. Cable Components and Connector part in house late week three or week four

3. Update Edge with task List and Pictures

4. Cont. Writing the Paper

5. Cont. Designing Poster

6. At the end of the week determine if we are on schedule

7.Document Everything that has been ordered and the prices in BOM (BOM Update)

Week Four Task List

Yevgeniy Popovskiy Vince Antonicelli Craig LaMendola Chrystal Andreozzi

1. The PWBA design for the outside case ready to order.

2. Outside PWBA is working. Paper work need to be completed to that both can be ordered early next week.

3. Finalize debugging the inside PWBA.

4. Update individual BOM

1. The PWBA design for the outside case ready to order.

2. Outside PWBA is working. Paper work need to be completed to that both can be ordered early next week.

3. Finalize debugging the inside PWBA.

4. Update individual BOM

1. Get approval for hardware from Dr. Day (need to discuss the inside case before ordering. There was some changes with price because of the size.)

2. Order Hardware. Hardware should be in at the end of the week

3. The solid work has been finalized and the stock size to the shop that will maek the cases.

4. Give finial drawing to shop.

5. Update individual BOM

1.At the end of the week I need to verify that the case has been ordered, and that the board is almost ready to order.

2. Cable Components and Connector part in house late week three or week four

3. Update Edge with task List and Pictures

4. Correct Paper

5. Correct Designing Poster

6. Make cable

7. At the end of the week determine if we are on schedule

8.Document Everything that has been ordered and the prices in BOM (BOM Update)

Week Five Task List

Yevgeniy Popovskiy Vince Antonicelli Craig LaMendola Chrystal Andreozzi

1. The PWBA design for the outside case ready to order.

2. Outside PWBA is working. Paper work need to be completed to that both can be ordered early next week.

3. Finalize debugging the inside PWBA.

4. ORDER PWBA

5. Update individual BOM

1. The PWBA design for the outside case ready to order.

2. Outside PWBA is working. Paper work need to be completed to that both can be ordered early next week.

3. Finalize debugging the inside PWBA.

4. ORDER PWBA

5. Update individual BOM

1. Make External Case

2. Update individual BOM

1. Correct Paper

2. Flexibility Test: Bending

3. Flexibility Test: Stiffness

4. Get Connectors

4. At the end of the week determine if we are on schedule

5.Document Everything that has been ordered and the prices in BOM (BOM Update)

Week Six Task List

Yevgeniy Popovskiy Vince Antonicelli Craig LaMendola Chrystal Andreozzi

1. The PWBA design for the outside case ready to order.

2. Outside PWBA is working. Paper work need to be completed to that both can be ordered early next week.

3. Finalize debugging the inside PWBA.

4. ORDER PWBA

5. Start wiring circuit

6. Update individual BOM

1. The PWBA design for the outside case ready to order.

2. Outside PWBA is working. Paper work need to be completed to that both can be ordered early next week.

3. Finalize debugging the inside PWBA.

4. ORDER PWBA

5. Start wiring circuit

6. Update individual BOM

1. Make External Case

2. Update individual BOM3.

3. Complete drawing for paper

4. This week and next week test cases

1. Correct Paper

2. Write Up Flexibility Test: Bending

3. Write Up Flexibility Test: Stiffness

4. Get Connectors

4. At the end of the week determine if we are on schedule

5.Document Everything that has been ordered and the prices in BOM (BOM Update)

Week Seven Task List

Yevgeniy Popovskiy Vince Antonicelli Craig LaMendola Chrystal Andreozzi

1. Complete Wiring on finial PWBA(inside and out)

2. Debug finial PWBA

3. Read Paper and make changes

4. Test PWBA

5. Talk to Dr. Day about using equipment to test

6. finalize BOM and give to team leader.

1. Complete Wiring on finial PWBA(inside and out)

2. Debug finial PWBA

3. Read Paper and make changes

4. Test PWBA

5. Talk to Dr. Day about using equipment to test

6. finalize BOM and give to team leader.

1. Complete drop test and leak test.

2. write test report

3. finalize BOM and give to team leader.

1.GET Finial wire count.

2. make second cable

3. test cable

4. write test report

5. talk to Day about getting connector accomplished by a lab person.

6. combine all BOM

Week Eight Task List

Yevgeniy Popovskiy Vince Antonicelli Craig LaMendola Chrystal Andreozzi

1. ORDER BOARD

2. Build boards

3. Get finial BOM and finials week schedule to team lead

1. ORDER BOARD

2. Build boards

3. Get finial BOM and finials week schedule to team lead

1. Write up test documentation

2. Work on Poster

3. Get finial BOM and finials week schedule to team lead

1. Combine Individual BOM's

2. Obtain finial week schedule to schedual finail meeting

3. Cable and connector hook up

4. Friday 1 p.m. Finial Paper Meeting

5. Start finial Presentation

Week Nine Task List

Yevgeniy Popovskiy Vince Antonicelli Craig LaMendola Chrystal Andreozzi

MAKE IT WORK

MAKE IT WORK

MAKE IT WORK

MAKE IT WORK

Week Ten Task List

Yevgeniy Popovskiy Vince Antonicelli Craig LaMendola Chrystal Andreozzi

MAKE IT WORK

MAKE IT WORK

1. MAKE IT WORK

2. Documentation

1. MAKE IT WORK

2. Documentation

3. Schedule Week 11 Meeting