P11232: UAV Air Frame C.1
/public/

Preliminary Work Breakdown Structure

Three Week Project Plan
Person Week 0->1 Tasks Week 1->2 Tasks Week 2->3 Tasks Week 3->4 Tasks Week 4->5 Tasks Week 5->6 Tasks Week 6->7 Tasks
Nathan Hardman Update Edge. Generate risks, engineering specs, and initial design concepts. Talk to Mr. Dave Hathway about machine shop capabilities.
Scott Melchionno Update Edge. Generate risks, engineering specs, and initial design concepts. Perform Aerodynamic analysis for new airfoil.
Stephen Cramb Research predecessor senior design projects. Generate risks, engineering specs, and initial design concepts. Research material properties for carbon fiber, fiberglass, honeycomb, etc.
Michelle Bailey Homework 1, Ford Pinto. Generate risks, engineering specs, and initial design concepts. Research material properties and materials used in current UAVs.
Jordan Carrick Research predecessor senior design projects. Generate risks, engineering specs, and initial design concepts. Research construction methods and materials used in UAVs.