P11462: Thermoelectric and Fan System for Cook Stove
/

public - Directory contents

Subdirectories
Battery Chargers display
Buck Boost Converter display
HAND-OFF DOCUMENTS display
MATLAB Code display
Pictures display
Poster display
Project Budget display
Solidworks Parts display
Switching Circuit display
TECH PAPER display
TESTING display
Tasks display
Files
4-14-11 Test display
4-22-11 Test display
4-8-11 Test display
5-4-11 Test display
Action Items_System Design Review.xls display
Additional Mechanical Considerations display
BOMV3.png display
BOM_V1.xls display
BOM_V1_Word_2007.xlsx display
BOM_V2.xls display
Battery Charger Test display
Battery Charger Test Data display
Battery Sizing display
Beam Drawing.jpg display
Beam Sizing Memo display
Beam size memo.docx display
Bill of Materials display
Block Diagram V2.jpg display
Block Diagram V2.xls display
Block Diagram V3.jpg display
Block Diagram V3.xls display
Block Diagram V3a.PNG display
Block Diagram.JPG display
Boost Converter Operational Test display
Boost Converter Test Data display
Bypass Operational Test display
Bypass Operational Test Data display
CFM flow rate calcs.xls display
Concept Design Review Action Items display
Concept Design Review Documents display
Concept Development display
Concepts.png display
ConceptsPugh.png display
Control System Block Diagram V2.jpg display
Control System Block Diagram V2.xls display
Control System Block Diagram V3.jpg display
Control System Block Diagram V3.xlsx display
Control System Block Diagram.JPG display
Control System Flow Diagram.jpg display
Control System Flow Diagram.xlsx display
ControlAirPugh.png display
ControlTempColdPugh.png display
ControlTempHotPugh.png display
Customer Constraints display
DDR Action Items.png display
DDR Action Items.xlsx display
Detail Design display
Detailed Design Review Action Items display
Detailed Design Review Documents display
Detailed_Design_Review_V1.doc display
Detailed_Design_Review_V1_Word_2007.docx display
Detailed_Design_Review_V2_Preread.docx display
Detailed_Design_Review_V2_Preread.pdf display
EE Hand-off display
Electric Startup Flow Chart.jpg display
Electric System.jpg display
Electrical Schematics display
EnclosureLocationPugh.png display
EnclosurePugh.png display
Energy Flow.jpg display
Engineering Specs Vs. Final Design display
Establish Target Specifications display
Fan Operational Test display
Fan Test Data display
Fan Testing.xlsx display
Final Budget display
Final Circuit display
Final ME Design display
Final Review Items display
Flow Rate Variation Test display
Generate Product Concepts display
Grading and Assessment Scheme display
Group Contact Info.pdf display
Group Contact Information display
Group Contact Information.xls display
HEAT SINK CALCULATIONS.docx display
Heat Sink Drawing.jpg display
Heat Sink Sizing Memo display
Heat Transfer Co-Ef.docx display
Home display
Housing Drawing.jpg display
How to Add A Simple Document to your website display
IV25.jpg display
IV50.jpg display
IV75.jpg display
Identify Customer Needs display
Identify Risks display
Impedence Curve.xls display
Initial Test Plan_V1.docx display
Intellectual Property Considerations display
Interface_Matrix_V1.0.xlsx display
Links display
ME Hand-off display
ME Pass-On Guide.docx display
ME suggestions for next team.docx display
MSD Contacts 2010-11.doc display
MSD II Week 10 Project Review Meeting.pdf display
MSD II Week 10 Project Review Meeting.pptx display
MSD2 Schedule V2.mpp display
MSD2 Schedule V2_Proj2003.mpp display
MSD2 Schedule V2_Proj2007.mpp display
MSD2 Schedule.gif display
MSD2 Schedule.mpp display
MSD2 ScheduleV2.gif display
Managerial Design Review Presentation display
Managerial Design Review Presentation (SD II) display
Managerial Design Review.docx display
Managerial Design Review.pdf display
Mechanical Detailed Drawings display
Mechanical System Live Test display
Mechanical System Test Procedure display
Mission Statement display
Overall Heat Transfer Coefficient Test display
P11462 Customer Needs and Engineering Specs_V1.xls display
P11462 Customer Needs and Engineering Specs_V1_Stevens Edits.xls display
P11462 Customer Needs and Engineering Specs_V2.xls display
P11462 Customer Needs and Engineering Specs_V3.xls display
P11462 Customer Needs and Engineering Specs_V3_post_Stevens_feedback.xls display
P11462 Customer Needs and Engineering Specs_V4.xls display
P11462 Hw4 Project Management Hw.doc display
P11462 Peer Assessment_template.xls display
P11462 Prob Solv Hw Fishbone.xls display
P11462 Problem Solving Hw.doc display
P11462 Risk Assessment.xls display
P11462 Schedule.gan display
P11462 Schedule.gif display
P11462 Schedule.mpx display
P11462 Schedule.png display
P11462 Schedule.xls display
P11462 Subsystem Functions.doc display
P11462 Week 1 Hw.doc display
P11462 Week 2 Update Presentation.pptx display
P11462_DDR Action_Items.docx display
P11462_HOQ_V1.xls display
P11462_HOQ_V2_LinkedVer.xlsx display
P11462_Pugh_V1.xls display
P11462_Risk_Assessment_Divided_by_SubSystem.xls display
P11462_Risk_Assessment_Divided_by_Subsystem_V2.0.xls display
P11462_Risk_Assessment_Divided_by_Subsystem_V3.0.xls display
P11462_Risk_Assessment_Divided_by_Subsystem_V4.0.xls display
P11462_Risk_Assessment_Divided_by_Subsystem_V4.1.xls display
P11462_Week3_Project_Update.pptx display
PCB Board Justification.docx display
PRP_11462_Cook_Stove_Power_Systems.doc display
PRP_11462_Cook_Stove_Power_Systems.pdf display
Photo Gallery display
Planning display
Poster Publication display
Poster Subsystem Picture.JPG display
Power Point Tracking.docx display
Power.jpg display
PowerGenAndStorePugh.png display
Preliminary Test Plans display
Preliminary Work Breakdown Structure display
Pressure Drop Through Stove System.docx display
Project Interface Matrix.jpg display
Project Interfaces display
Project Interfaces.jpg display
Project Readiness Package display
Proposed Design Screenshots display
Proposed Product Concept display
ProvideAirPugh.png display
ProvideHeatPugh.png display
Required Resources display
Select Product Concept(s) display
SideMountPugh.png display
Staffing Requirements display
Stove Pressure Drop Test display
Sub_system_ownership_V1.0.xlsx display
Subsystem Interfaces.jpg display
Switching Circuit Test display
Switching Circuit Test Data display
System Level Design display
System Level Technical Review Agenda.docx display
System Level Technical Review Agenda_oldWord.doc display
System Level Technical Review Agenda_oldWord.docm display
System Level Technical Review_V2.0.doc display
System_Level_Technical_Review_V2.1.doc display
System_Level_Technical_Review_V3_preread.doc display
System_Level_Technical_Review_V4_preread.doc display
System_Level_Technical_Review_V4_preread.pdf display
TEG Back.jpg display
TEG Delta-T vs Power Curve display
TEG Exploded.jpg display
TEG Front.jpg display
TEG I-V Curve display
TEG Power vs. Resistance Curve display
TEG Power vs. Time Curve display
TEG Stove Sep.jpg display
TEG Stove.jpg display
TEG Testing Results.xlsx display
TEG_Stove_Pair.jpg display
TEG_System.jpg display
THERMAL BRIDGING CONSIDERATIONS.docx display
Team Values and Norms display
Technical Conference Publication display
Test Temp Rise Curve display
TestFile.jpg display
Tested Engineering Specs.docx display
Testing and Refinement display
Thermoelectric I-V and Power Curves display
Water Boil Test Varied Flow Rate.xls display
Whole Circuit.JPG display
meeting1.jpg display
meeting10.jpg display
meeting2.jpg display
meeting3.jpg display
meeting4.jpg display
meeting5.jpg display
meeting6.jpg display
meeting7.jpg display
meeting8.jpg display
meeting9.jpg display
msd1.jpg display
msd10.jpg display
msd11.jpg display
msd12.jpg display
msd13.jpg display
msd14.jpg display
msd15.jpg display
msd16.jpg display
msd2.jpg display
msd3.jpg display
msd4.jpg display
msd5.jpg display
msd6.jpg display
msd7.jpg display
msd8.jpg display
msd9.jpg display
testing1.jpg display
testing2.jpg display
testing3.jpg display
testing4.jpg display
testing5.jpg display
total system impedence.xlsx display