The list of engineering specifications was developed from information gathered from the project readiness package and multiple interviews with the customer. The importance of meeting each target specification is ranked on a 9-3-1 scale, in which 9 represents a specification which is critical to system success, 3 is less important, and 1 is preferred but not necessary. The list of specifications is presented below (future), and is also available as an excel spreadsheet.

public/EngineeringSpecs2.png

Document Links

Design option excel document


Project Plan | Customer Needs | Project Risks | Work Breakdown