Files
3 Dimensions Designs display
Accepted Norms of Performance display
Arrival of Cheesecakes display
Bill of Materials display
Bill of Materials 2 display
Comparison of Project Process to Initial Plan display
Comparison of Risk Assessment display
Comparison of Risk Assessment to Initial Risk List display
Concept Design Review Documents (SD I) display
Concept Development display
Conveyor Belt Timer - Control Box display
Current State of Design display
Customer Constraints display
Customer Needs display
Deliverables Checklist (for Reference) display
Departure of Cheesecakes display
Design Logic display
Detail Design display
Detailed Design Review Documents (SD I) display
Do and Don't Check List display
Dosing System 1 display
Dosing System 2 display
Electrical System Test display
Engineering Specifications display
Establish Target Specifications display
Feasibility Analysis display
Final Risk Assessment display
Flowchart of System Logic (PDF) display
Generate Product Concepts display
Geoffrey Cresswell SD II display
Grading and Assessment Scheme display
Head Loss display
Home display
How to Add A Simple Document to your website display
Identify Customer Needs display
Initial Risk List display
Intellectual Property Considerations display
Joel Sack display
Joel Sack SD II display
John Janiszewski display
John Janiszewski SD II display
Managerial Design Review Presentation (SD II) display
Manual Flow Meter display
Mission Statement display
Noah Mauer display
Noah Mauer SD II display
Outlet Design Presentation display
Outlet Design Proposal display
Outlet Design Pugh Matrix display
PRP_11712_WegmansCheesecake.doc display
Pan Break Stop display
Personal Evaluations display
Personal Evaluations SD II display
Personnel Evaluations display
Photo Gallery display
Planning display
Poster Publication (SD II) display
Preliminary Test Plan display
Preliminary Work Breakdown Structure display
Pressure Regulator display
Project Plan display
Project Plan - Rev 1 display
Project Plan - Rev 2 display
Project Plan - Rev 3 display
Project Plan MSD I display
Project Plan MSD II display
Project Plan MSD III display
Pugh Diagram display
Required Resources display
Result Page 1 display
Result Page 2 display
Risk Analysis display
Risk Assessment display
Risk List display
Rodrigo Velarde display
Rodrigo Velarde SD II display
Select Product Concept(s) display
Set Final Specifications display
Solenoid for Piping System display
Staffing Requirements display
State of Current Design (SD I) display
System Level Design display
System Overview display
Target Specs display
Tasks List display
Team Agreement of Values and Norms display
Team Notes at the End of Week 11 display
Team Values and Norms display
Team Work Breakdown Structure display
Technical Conference Publication (SD II) display
Test Plans display
Test Product Concept(s) display
TestFile.jpg display
Testing Page 1 display
Testing Page 2 display
Testing Page 3 display
Testing Page 4 display
Testing Steps and Results display
Testing and Refinement display
Throughput Analysis display
Tony Shen display
Tony Shen SD II display
Verification Test display
Video Gallery display
Water Spill Test display
angled_outlet.asm display
angled_outlet.pdf display
conveyor_assembly.asm display
conveyor_assembly.pdf display
elevated.asm display
elevated.pdf display
linear_outlet2.pdf display
sprinkler_design.pdf display
sprinkler_design_2.asm display
straight_output.asm display