Planning & Execution

Table of Contents

Intellectual Property Considerations

As a RIT funded project, any IP generated as a result of this project should belong to RIT but the project champion should check the details

Code of Ethics

Code of Ethics was created in MSD I in Week 1.

Team Norms & Values

Team Values and Norms was created in MSD I and is updated in MSD II or as needed.

Work Breakdown and Responsibilities

Aleef Mahmud - Serve as Team Leader on decisions and planning for the development of the system. Provide communication link between the customer, management, and the team.Develop the Seat Interface and Crank System. Provide analysis for the Passenger Interface and Tiller Strut. In charge of overall system integration of the separate subsystems as well as to the commercial/custom seat. Lead the testing process of the integrated system. Track the progress of the project as it develops and continuously plan. Update content created for the project and post it on EDGE.

Mitchel Rankie - Serve as Mechanical Engineer for modeling and benchmarking the current system. Develop, analyze, manufacture and assemble the Passenger Interface and Easy Release Grips. Assist in integrating and testing the Passenger Interface and Easy Release Grips with the other subsystems.

Steven Gajewski - Serve as Mechanical Engineer for modeling and benchmarking the current system. Develop, analyze, manufacture and assemble the Pedestal Base and Tiller Strut. Assist in integrating and testing the Pedestal Base and Tiller Strut with the other subsystems.

Christopher "Chappy" Sullivan - Serve as System Engineer for interfacing with marine vehicles and utilizing boating parts. Develop, analyze, manufacture and assemble the Track Platform. Assist in integrating and testing the Track Platform with the other subsystems.

Channels of Communication

Team will communicate via phone calls, email, and text messages depending on the urgency and/or length of the message. Team will share documents primarily via Tortoise SVN and Google Docs. Team leader will serve as the primary channel of communication between the team and the customers/sponsors. Material and content created by the team can be viewed on either EDGE or by request.

Project PRP

Project PRP is listed for reference.

1-Page Summary

Project Summary details the quick and easy summary of the project for development during MSD I & II.

Customer Needs

Customer Needs excel sheet is iteratively updated to reflect the project needs.

Engineering Specifications

Engineering Specification excel sheet is iteratively updated to reflect the project needs.

Benchmarking the Original System

There was a multitude of Material referenced as benchmarks for the new design. The original design is bench-marked against specifically to gauge improvements in performance. The following pictures show some of the views of the current system:

 Original System

Original System

Original Passenger Interface

 Original Passenger Interface

Original Passenger Interface

Original Track Platform

 Original Track Platform

Original Track Platform

Original Track Platform Support

 Original Track Platform Support

Original Track Platform Support

Original Pedestal Base

 Original Pedestal Base

Original Pedestal Base

Original Pedestal Base bottom view

 Original Pedestal Base bottom view

Original Pedestal Base bottom view

Original Tiller Strut

 Original Tiller Strut

Original Tiller Strut

Original Tiller

 Original Tiller

Original Tiller

Milepost

Professor Hanzlik has done an excellent job of outlining our expected 'Milepost' with which we can create an project schedule that can factor in such milestones. Much of the work for the MSD I & II schedule was based on the interpretation of these mileposts.

MSD Planning and Breakdown

Project Plan outlines the work and milestones planned for completion. The work breakdown has been broken down into sub-categories of phases that will need to be completed in sequence for adequate completion of the project.

MSD I Project Plans

 Generalized MSD I Schedule

Generalized MSD I Schedule

MSD II Project Plans - Manufacturing and Testing Phase

 MSD II Manufacturing and Testing Phase

MSD II Manufacturing and Testing Phase

MSD II Project Plans - Presentation and Completion Phase

 MSD II Presentation and Completion Phase

MSD II Presentation and Completion Phase