P12412: UV Water Treatment Safety Valve
/public/

Risk Assessment

Non-Technical Risk Evaluation

public/nontechnical_risks.JPG

The above risks are the non-technical risks which could possibly occur as the project continues. Non-technical risks are those which may not involve the product design itself (hardware), but may hinder the progress of the project going forward. It can be seen that the main risks here are as follows:

Other notable risks here include:

The major risks were determined by likelihood and severity of the risk. Actions which could be taken to minimize the risk are listed as well.

Technical Risk Evaluation

public/technical_risks.JPG

The risks shown above are the technical risks, which are more involved with the detailed design of the product. The main risks in this case are as follows: