P13421: Ice Pile Air Conditioning
/public/

Planning & Execution

Table of Contents

Background

As an institution dedicated to sustainability, RIT strives to become carbon neutral by 2030. With this goal in mind, RIT is also rapidly expanding and has recently approved a proposal to construct a new ice arena in addition to the existing one. The running costs of an ice arena for surpass a typical building and, in fact, are one of the most inefficient structures in comparison to any building. The inefficiencies stem from the need to sustain a cool environment for the ice as well as a comfortable environment for spectators. Along with the temperature difficulties, the building humidity must be kept as low as possible as not to create fog over the cold ice. With all of this being done to sustain the "most expensive ice in the world", between 100 and 500 cubic feet of ice is discarded behind the building daily. This waste ice will become the focus of our project.

Project Goal

The project goal will be to create a proof-of-concept device proving that the discarded ice can be used in a way such that cooling and conditioning of air can take place at a significantly reduced energy cost than that of a standard air conditioning unit. A successful prototype would demonstrate the cooling of a small enclosed space utilizing a portion of the waste ice currently being produced. It will also prove that ice can be used to cool air at a lesser cost than a standard air conditioning unit.

Part of the project will set a theoretical plan for scaling of the successful prototype to a size large enough to make an impact on the ice arena.

Project Summary

Customer Needs

Specifications

public/Photo Gallery/Constraints.JPG

Team Norms & Values

Team Code of Ethics

Project Plans & Schedules

Project Schedule

Meeting Minutes, Notes, & Actions

MSD I & II

Meeting Minutes 9-7-2012

Ice Rink Meeting Minutes 9-13-2012