P13556: Wyman-Gordon Forging Locator II
/public/

Systems Design

Table of Contents

This page contains the major deliverables associated with the Systems Design Review. This is currently scheduled for Friday October 5, from 10:30AM to 12:00PM in GLE-2030.

Benchmarking

Programming Language and Mounting Benchmarking

Micro-Epsilon OPTONCDT ILR1181

Programmable Logic Controllers (PLC's)

Concept Development

Data Processing & Manipulation Pugh Analysis

Data Processing & Manipulation Pugh Analysis


Mounting System Pugh Analysis

Mounting System Pugh Analysis

Pugh Analysis

Customer Needs and House of Quality

Voice of the Customer

Voice of the Customer

The table above is a summarized view of the customer needs acquired from the Project Readiness Package and data from the previous MSD group. The last column represents a metric by which the customer needs can be verified. The importance column ratings are as follows:

VoC


House of Quality

House of Quality

The table above maps the Customer Needs to Engineering Metrics to determine if all needs are being met to desired nominal values.

HoQ

Systems Architecture

System Diagram

System Diagram

System Diagram

Risk Assessment

Risk Assessment

Risk Assessment

The table above is a summarized view of the potential risk items associated with the project. Each risk item has a corresponding Likelihood, Severity, and Importance.

Risk Assessment

Task Assignment

Task Assignment

Task Assignment

Task Assignment Spreadsheet

Systems Design Review

System Design Review