P13671: Garlock Expansion Joint
/public/

Detailed Design

Table of Contents

Website should document your journey through MSD, so include work-in-progress as well as latest results. Use pdf's for display whenever possible so that information is easily viewable without the need to download files and open applications. (Your EDGE file repository should still contain original files).

Sample categories are listed below, but feel free to change or add nodes to better correspond to your project and your Guide’s expectations.

Prototyping, Engineering Analysis, Simulation

EJ Displacement Test

We filled a 6" EJ with water and compressed it 1" to see the amount of water displaced. The purpose of this test is to look at the feasibility of using the actuation of the EJ as a pump instead of using a separate and more expensive pump.
Volume of Water Displaced vs. Axial Displacement

Volume of Water Displaced vs. Axial Displacement

FinalDocuments/Data/EJ Displacement Test results.xlsx

System Thermal Simulation

Thermal System Model

Thermal System Model

FinalDocuments/Simulation/EJModel.mdl

Drawings, Schematics, Flow Charts

System Architecture

System Architecture

Actuator Connection Rod

Bottom Plate

Clevis

Middle Plate

Mounting Plate

Bracket

Top Plate

Bill of Materials (BOM)

The following is our Bill of Materials and Purchasing Records:

Test Plans

Below you will find the Test Plan we designed to ensure the customer needs and project specifications will be met:

Risk Assessment

Risk Assessment

Risk Assessment

Detailed Design Review

Presentation, notes, actions.

Home | Planning & Execution | Systems Design | Build, Test, Document | Photo Gallery