Project Plan and Problem Tracking

Throughout the project, there have been a number of issues that needed to be addressed, or facets of the design that didn't work exactly as planned. These problems were addressed using a six-step method detailed in the preparation phase of MSD II. These unforeseen issues resulted in modifications to certain aspects of the design, which ultimately ended up affecting timetables. In the spirit of accurate record keeping, the project plan was re-evaluated in the light of these obstacles, and updated to reflect the current timeline.

Both the project plan and problem tracking can be viewed in the "Master Management Document" found here.