P14254: Underwater Thermoelectric Power Generation
/public/WikiPages/

Test Plans

Table of Contents

Heat Sink

Heat Sink Test Plan

Thermoelectrics

The thermoelectric test can be performed as soon as the thermoelectric modules are received. The equipment needed for this test is already present in the Sustainable Energy Lab.

Test Plan (PDF)

Waterproofing

In order to correctly identify the source of leaks, the waterproofing test will be conducted in steps as the enclosure is being manufactured. The first step will be to test the primary seals, the next step to test the cable glands, and finally, all other seals (if necessary) will be tested.

Test Plan (PDF)

Clamping

The overall assembly plan for the Clamping subsystem is found here:

Clamping Assembly Plan

Primary Insulation

Insulation Test Plan

Electrical Testing

Battery Tests

Electronics Tests