P14346: Environmental ADC Interface
/public/

Planning & Execution

Design Phase (MSD 1)

1. Customer Requirements

2. Engineering Requirements

3.a. Engineering Analysis

3.b. Engineering Analysis (TI MSP430)

4. Expected Performance

5. Critical Systems

6.a. Microcontroller Flow Chart

6.b. PC Flow Chart

7. Power Requirements

8. Sub-system Architecture

9. System Desgin

Project Planning & Risk Assessment

1. BOM (09-20-2014)

2. MSD-2 Five Week Plan (09-20-2014)

3. Risk Management (09-20-2014)

Project Outcomes

1. Learning Modules


Home | Planning & Execution | Problem Definition | Systems Design | Detailed Design | Build, Test, Document | Project Review | Photo Gallery