P14361: Engineering Applications Lab Modules
/public/

Detailed Design

Table of Contents

All content can be found here DDR_Documents directory.

Final 2 Modules

  1. Rain-gun/Launcher
  2. Helicopter Propeller

Module Set up

Rail-Gun/Launcher

The Full Rail Gun
Railgun Circuit

Railgun Circuit

Railgun Box

Railgun Box

Railgun Box

Railgun Box

Railgun iso

Railgun iso

Railgun top

Railgun top

Railgun side

Railgun side

Railgun iso

Railgun iso

Railgun side

Railgun side

Railgun top

Railgun top

Railgun BOM

Railgun BOM

Railgun Car

Railgun Car

Railgun Iso Car

Railgun Iso Car

Railgun Rail

Railgun Rail

Railgun Top Car

Railgun Top Car

For the rest of the track
Railgun Hot Wheels track

Railgun Hot Wheels track

Rail-gun/Launcher BOM

Railgun BOM

Railgun BOM

Thrust Module

Test Set up. For the Pro/E file Click Here For the PDF file Click Here 10/06/14

Full Set Up

Full Set Up

Full Set Up

Full Set Up

9/16/14
Full Set Up

Full Set Up

Full Set Up

Full Set Up

Full Set Up

Full Set Up

Set Up

Set Up

Set Up

Set Up

Set Up

Set Up

Set Up

Set Up

Set Up

Set Up

Set Up

Set Up

Thrust Module BOM

BOM

BOM

Note: Changing to the BOM will be done per changes to the project scope.

Bill of Material (BOM)

For the most up to date BOM please click Here For the Full Excel and click Here For PDF

BOM

BOM

Student Experience

Rail Gun

Student Experience

Student Experience

Thrust Module

Student Experience

Student Experience

Risk Assessment

Rain-gun/Launcher

Risk Assessment RG

Risk Assessment RG


Out Dated
ID Risk Item Cause Effect Likelihood Severity Importance Action of Management Owner
1 Improper insulation Not enough insulation Injury to student or damage to module 2 3 6 Layer polycarbonate on the side, middle and top of the armature Rail Gun Team
2 Defects in parts Defects in parts Change in resistance and varying student outcomes 1 3 3 Inspect all parts when they come in, send parts back that are defective Rail Gun Team
3 Corrosion Corrosion in envirnoment Rail Gun will not function 1 1 1 Make sure module is in an environment where this will not occur Rail Gun Team
4 Varations in Student Outcomes Analytical and Experimental analysis do not match Inconsistency with analysis 2 3 6 Will be further developed in MSDII P14361
5 Electrocution of Student Student touches capacitor, rails or where power source connects to capacitor bank Minor to severe injury to student 1 3 3 No unnecessary exposed wires, insulation on module and have students wear rubber gloves Rail Gun Team
6 Damage of Property Projectile hits something delicate Projectile hits and breaks object/s in lab 1 3 3 Clear path for projectile prior to launching Rail Gun Team

Propeller

Updated Risk Assessment
Risk Assessment Propeller

Risk Assessment Propeller


Out Dated
ID Risk Item Cause Effect Likelihood Severity Importance Action of Management Owner
1 Varations in Student Outcomes Analytical and Experimental analysis do not match Inconsistency with analysis 2 3 6 Will be further developed in MSDII P14361
2 Speed Too much torque Module may fly away from testing apparatus 1 1 1 Design and set up a mount to make sure this does not occur Propeller Team
3 Variablity Not enough combinations of blades to change outcomes The analysis will be the same for each student 1 1 1 Students create various shapes of blades that have been or can be rapid prototyped Propellor Team
4 Lifting Forces Lift force induces stress Damage to propeller 1 3 3 Limit the RPM of the motor, find the max RPM, to be further tested in MSDII Propellor Team

Design Reviews

Project Needs and Requirements

To view the Project Needs and Requirements Click Here


Home | Planning & Execution | Problem Definition | Systems Design | Detailed Design | Build, Test, Document | Project Review | Photo Gallery