P14471: Vibration Test Apparatus II
/public/

Detailed Design

Table of Contents

Prototyping, Engineering Analysis, Simulation

Iterative activities to demonstrate feasibility.

Slider Stress

Slider Stress with Contour Lines

Total Deformation

Von Mises Stress

Displacement Z Direction

Ansys Analysis for Guard Mount

Ansys Analysis for Motor Mount

Engineering Analysis - System

Engineering Analysis - Subsystems

Engineering Analysis - Subsystem (updated friction)

Engineering Analysis - Displacement Slip Calculations

Drawings, Schematics, Flow Charts, Simulations

Total Assembly Breakdown

Total Assembly Breakdown

Total Assembly Breakdown

Room Layout

Room Layout

Room Layout

Frame Attachments Adjustment Improvements Safety Motor Electrical

B1

B2

B3

B4

B5

B6

B7

B8

B9

B10

B11

B12

B13

B14

B15

Luminaire Conduit Assembly

Crank Rod

Screw Plate

Slider

Polycarbonate Guard (Back)

Crankshaft (shaft)

Polycarbonate Guard (Top)

Belt Guard

Belt Guard Mount

Motor Mount

Motor Mount Part 1

Motor Mount Part 2

Motor Dimensions

Connections

Coupling

Encoder Diagram

Encoder Specs

VFD PIN Connections

VFD Motor Connection

Power Schematic

Electrical enclosure

Power calculations

AC-DC converter

Other Sizes for

B13:1/2"; 3/4"; 1"; 1-1/2"

B14:1/2"; 3/4"; 1"; 1-1/2"

B15:1/2";3/4";1";1-1/2"

Bill of Material (BOM)

Bill of Materials

Setup Improvements

Setup Procedure (early draft)

Operation Manual (final)

Setup Improvements

Setup Improvements

Test Plans

Test Plan

Safety Checklist

Risk Assessment

Risk Assessment
Risk Analysis 12/11/2013

Risk Analysis 12/11/2013

Project Plan

Full Project Plan
Next Phase 11/20/13 - 12/20/13

Next Phase 11/20/13 - 12/20/13

Early MSDII Schedule

Early MSDII Schedule

Preliminary Design Reviews

Mechanical DDR Outcomes - General (Dr. Varela)

Mechanical DDR Outcomes - Vibration (Dr. Ghoneim)

Mechanical DDR Outcomes - Torque and Fatigue (Dr. Boedo)

Electrical DDR Outcomes - Power (Dr. Amuso)

Electrical DDR Outcomes - Power (Dr. Mathews)

Detailed Design Review

Detailed Design Review

Action Items from Detailed Design Review

Meeting notes and Emails -DDR Phase


Home | Planning & Execution | Problem Definition | Systems Design | Detailed Design | Build, Test, Document | Project Review | Photo Gallery