P15041: Smart Walker III
/public/

Planning & Execution

Table of Contents

Team Roles


Team Values and Norms

Punctual
Each team member will be prompt and arrive at the team meetings on time. If an unexpected conflict comes up, the absent team member will notify at least one team-mate prior to the expected absence. An absent team-member should confirm that a team-mate has received their message (in person, voice mail, email, etc).
Transparent
Each team member will keep all other members up to date on their individual milestones. They will also notify the team if they need assistance or if they are falling behind AS SOON as it is recognized. All members must keep up to date on the Groupme thread so that problems can be solved as they arrive.
Thorough
Each team member will complete their tasks thoroughly and completely, so that the work does not have to be re-done by a peer on the team. If a member does not know how to complete a task, feels overwhelmed, or needs assistance then the member notifies peers, and seeks assistance either from a peer, the faculty guide, a faculty consultant, or another person.
Accurate
Each team member completes their work accurately and in a way that can be easily checked for accuracy by peers and the faculty guide. All work is fully documented and easy to follow.
Professional and Ethical
Each team member gives credit where credit is due. All work completed includes citations to appropriate literature, or sources of assistance. If a team member has gotten assistance from a publication or individual, then that assistance or guidance is fully documented in the reports prepared. Each team member is honest and trustworthy in their dealings with their peers.
Demonstrates the core RIT values of SPIRIT
http://www.rit.edu/overview/vision.html
Committed
Each team member will contribute an equal share to the success of the project.


Project Plans & Schedules

  1. Week 3: Review Powerpoint for Design Review on Thursday February 12.
  2. Weeks 4-6: Begin testing of subsystem components (both electrical and mechanical)

Mechanical Final Weeks

Mechanical Schedule
Week 11 Week 12 Week 13 Week 14 Week 15
Kailee Build Clutch Prototype, Test Clutch Prototype BMI Research, BOM, Read-Me First Design Xtion Casing Wiring Diagram??, Manufacturing Manufacturing, Calibrate Load Cells??
Chris Consult Expert for Clutch Design, 3D Model Clutch 3D Model Proposed Wheel Fix, Consult Expert 3D Model Xtion Casing Wiring Diagram??, Manufacturing Manufacturing, Calibrate Load Cells??

MSD II Preliminary Schedule

Mechanical Schedule
Weeks 1-3 Weeks 4-5 Week 6 Week 7 Week 8 Weeks 9-15
Both Manufacturing, Assembling, 3D Printing Subsystem Assembly Test Clutch System Test Load Cells Test Strain Gauges Test Integrated Systems


Functional Decomposition

Functional Decomposition

Functional Decomposition


Customer and Engineering Requirements

Updated customer and engineering requirements can be found on our Problem Definition page.


Risk Assessment

Our updated risk assessment can be found here.


Bill of Materials

Our current BOM can be found here.


Meeting Minutes, Notes, & Actions

First Customer Interview

Interviewers: David Malanga, Kailee Polimeni, Jeremy Rossi, Jun Jie Huang
Sponsor: Ferat Sahin
Date 3 February 2015, 3rd Floor of Gleason Engineering Building
Interview Notes

Second Customer Interview

Interviewers: David Malanga, Kailee Polimeni, Jeremy Rossi, Jun Jie Huang
Sponsor: Ferat Sahin
Date 24 February 2015, 3rd Floor of Gleason Engineering Building
Interview Notes

Third Customer Interview

Interviewers: David Malanga, Kailee Polimeni, Chris Jones, Jeremy Rossi, Jun Jie Huang
Sponsor: Ferat Sahin
Date 10 March 2015, 4435 Senior Design Lab
Interview Notes

Fourth Customer Interview

Interviewers: David Malanga, Kailee Polimeni, Jeremy Rossi, Jun Jie Huang
Sponsor: Ferat Sahin
Date 17 March 2015, 3rd Floor of Gleason Engineering Building
Interview Notes

Fifth Customer Interview

Interviewers: David Malanga,Jeremy Rossi, Jun Jie Huang
Sponsor: Ferat Sahin
Date 31 March 2015, 3rd Floor of Gleason Engineering Building
Interview Notes

Sixth Customer Interview

Interviewers: David Malanga,Jeremy Rossi, Jun Jie Huang, Kailee Polimeni
Sponsor: Ferat Sahin
Date 7 April 2015, 4425 Senior Design Floor
Interview Notes (ME Section)
Interview Notes (EE Section)

Seventh Customer Interview

Interviewers: David Malanga,Jeremy Rossi, Jun Jie Huang, Kailee Polimeni
Sponsor: Ferat Sahin
Date 14 April 2015, 4425 Senior Design Floor
Interview Notes

Eighth Customer Interview

Interviewers: David Malanga,Jeremy Rossi, Jun Jie Huang, Kailee Polimeni
Sponsor: Ferat Sahin
Date 21 April 2015, 4425 Senior Design Floor
Interview Notes

Ninth Customer Interview

Interviewers: David Malanga,Jeremy Rossi, Jun Jie Huang, Kailee Polimeni
Sponsor: Ferat Sahin
Date 28 April 2015, 4425 Senior Design Floor
Interview Notes

Tenth Customer Interview

Interviewers: David Malanga,Jeremy Rossi, Jun Jie Huang, Kailee Polimeni
Sponsor: Ferat Sahin
Date 5 May 2015, 4425 Senior Design Floor
Interview Notes

Final Detailed Design Review

Interviewers: David Malanga,Jeremy Rossi, Jun Jie Huang, Kailee Polimeni, Chris Jones
Sponsor: Ferat Sahin
Date 14 May 2015, 4435 Senior Design Floor
Interview Notes (ME Section)
Interview Notes (EE Section)


Peer Reviews

These are completed by all members after each 3 week phase. They are kept individually and can be provided if necessary.