P16006: Tub Lift 2
/public/

Integrated System Build & Test with Customer Demo

Table of Contents

Team Vision for System Level Demo with Customer

We sought to finish building the swivel assembly and main lift. The swivel assembly has been fully built, while there are a few remaining action items for the main lift. The chair needs to be attached to the top of the lift and some remaining problems need to addressed as per the problem tracker.

https://edge.rit.edu/dav/P16006/web/public/Integrated%20System%20Build%20and%20Test%20with%20Customer%20Demo/Swivel%201.jpeg

https://edge.rit.edu/dav/P16006/web/public/Integrated%20System%20Build%20and%20Test%20with%20Customer%20Demo/Extended%20Lift.png

https://edge.rit.edu/dav/P16006/web/public/Integrated%20System%20Build%20and%20Test%20with%20Customer%20Demo/Retracted%20Lift.png

https://edge.rit.edu/dav/P16006/web/public/Integrated%20System%20Build%20and%20Test%20with%20Customer%20Demo/Lift%201.jpeg

https://edge.rit.edu/dav/P16006/web/public/Integrated%20System%20Build%20and%20Test%20with%20Customer%20Demo/Lift%202.jpeg

https://edge.rit.edu/dav/P16006/web/public/Integrated%20System%20Build%20and%20Test%20with%20Customer%20Demo/Lift%203.jpeg

Test Results Summary

No further testing has been conducted since the last phase as the lift and swivel assemblies are currently being put together. Once these main systems are in a functional state, we will be able to fill out the rest of the test requirements that have been identified.

https://edge.rit.edu/dav/P16006/web/public/Subsystem%20Build%20and%20Test/Finalized%20Test%20Plans.PNG

Please click the following link to download:

Test Plans

Risk and Problem Tracking

The risk management sheet has not changed from the last phase.

https://edge.rit.edu/dav/P16006/web/public/Project%20Management/risk%20and%20problem%20management/Risk%20Management%20Graphic.PNG

Please click the following link to download:

Risk management Assessment

Problem Tracking

Some additional problems have come up during assembly of the lift. most have been addressed.

https://edge.rit.edu/dav/P16006/web/public/Integrated%20System%20Build%20and%20Test%20with%20Customer%20Demo/Problem%20tracker%201.JPG

https://edge.rit.edu/dav/P16006/web/public/Integrated%20System%20Build%20and%20Test%20with%20Customer%20Demo/Problem%20tracker%202.JPG

Please click the following link to download:

Problem Tracker

Bill of Materials Changes

Due to problems that have arise, some minor changes have been made to the Bill of Materials, as depicted below:

https://edge.rit.edu/dav/P16006/web/public/Integrated%20System%20Build%20and%20Test%20with%20Customer%20Demo/BOM%20Main%20Lift.JPG

Please click the following link to download:

Bill of Materials

Plans for next phase

Once the remaining issues associated with the main lift are taken care of, testing can proceed and then the project will be complete, assuming the tests are successful.

Please refer to the following attachments to view individual plans for the next phase of the project:

Branch - Integrated System Build & Test with Customer Demo
Hall - Integrated System Build & Test with Customer Demo
Krall - Integrated System Build & Test with Customer Demo
Swearingen - Integrated System Build & Test with Customer Demo

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation