P16081: Circulatory System
/public/

Customer Handoff & Final Project Documentation

Table of Contents

Test Results Summary

Test Plans
Test ID Eng. Req. Number Risks Test Title Completed
T1 ER1 Risk 1 Max Pressure Sensor Range Yes
T2 ER2 Risk 2 Pressure Sensor Yes
T3 ER3 Risk 3 Pressure Sensor Range Yes
T4 ER4 Risk 4 Resistance Calculation NO
T5 ER5 Risk 5 Compliance Yes
T6 ER6 Risk 6 Functionality Time Trial NO
T7 ER7 Risk 7 Interface Test between P16080 and P16081 Yes
T8 ER8 Risk 8 Match to Theory Yes
T9 ER9 Risk 9 Life Cycle NO
T10 ER10 Risk 10 Deionized Water Check Yes
T11 ER11 Risk 11 Assembled Device Size Yes
T12 ER12 Risk 12 Transparency Confirmation Yes
T14 ER14 Risk 14 Cleaning Yes
T15 ER15 Risk 15 Reproducibility Test Yes
T16 ER16 Risk 16 Cost Analysis Yes
T17 ER17 Risk 17 Spill Test Yes
T18 ER18 Risk 18 Safety Standards Yes

For our Testing Documention that shows the outcomes from each of these tests click here.

Overall for testing we were successful, as we were able to generate data and results for 82% of our tests, the ones that we were not able to generate results for were testing intensive which involved the pump which was not available for the vast majority of the semester.

Risk and Problem Tracking

This chart shows the risks that have been faces over the course of Senior Design.

This chart shows the risks that have been faces over the course of Senior Design.

For an excel version of the Risk Chart click here.

Final Project Documentation

For our final poster click here.

For our technical paper click here.

For our instruction manual click here. This manual will walk the user through using the system, including priming and operating the valves.

Final CAD Model.

Final CAD Model.

Bill of Materials for the end of the Semester.

Bill of Materials for the end of the Semester.

For a live link to our final Bill of Materials click here.

Final LabView Code.

Final LabView Code.

Final Student Interaction for LabView.

Final Student Interaction for LabView.

For a rough estimate of the build time for the system click here.

Budget Update

We were given a budget of $600, we spent a total of $390.18. This gave us a remainder of $209.82.

Recommedations for future work

Fully integrate the pump with the circulatory system.

Test and calibrate the pump with the circulatory system.

Design the final lab requirements and lab outline.


MSD I

Planning & Execution Problem Definition Systems Design Subsystem Design Preliminary Detailed Design Detailed Design

Team Members and Roles

Team Values and Norms

Project Plans & Schedules

Risk Management

Meeting Minutes, Notes, & Actions

Background

Stakeholders

Customer Requirements

Engineering Requirements

House of Quality

Risks and Concerns

Phase I Review

Functional Decomposition

Benchmarking

Concept Development

Suppliers

Existing Models

Morphological Chart

Concept Comparison and Selection

Systems Architecture

Risk Assessment

Feasibility

Drawings

Bill of Materials

Risk Assessment

Design Review Materials

Drawings

Bill of Material

Risk Assessment

Design Review Materials

Drawings

Bill of Material

Test Plans

Risk Assessment

Review Material

MSD II

Build & Test Prep Subsystem Build & Test Integrated System Build & Test Integrated System Build & Test with Customer Demo Customer Handoff & Final Project Documentation Imagine RIT

Team Vision

Test Plan Summary

Risk Assessment

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Final Documentation

Functional Demo Materials

Plans

Photos

Videos

Handouts