P16081: Circulatory System
/public/

Detailed Design

Table of Contents

















Drawings, Schematics, Flow Charts, Simulations

Updated CAD Models

Arterial Subsystem Schematic

Arterial Subsystem Schematic

Venous Subsystem Schematic

Venous Subsystem Schematic

Assembled System Drawings

Assembled System Drawings

Assembled System Dimensions

Assembled System Dimensions

Resistors

Plate Resistor Prototype

Plate Resistor Prototype

LabView

LabView Front Panel

LabView Front Panel

LabView Block Diagram

LabView Block Diagram

Compliance Ranges vs Fluid Height

Compliance Ranges vs Fluid Height

Compliance Ranges vs Fluid Height

Bill of Material (BOM)

Bill of Materials

Bill of Materials

Test Plans

Test Plans
Test ID Eng. Req. Number Risks Test Title Completed
T1 ER1 Risk 1 Max Pressure Sensor Range NO
T2 ER2 Risk 2 Pressure Sensor NO
T3 ER3 Risk 3 Pressure Sensor Range NO
T4 ER4 Risk 4 Resistance Calculation NO
T5 ER5 Risk 5 Compliance NO
T6 ER6 Risk 6 Functionality Time Trial NO
T7 ER7 Risk 7 Tube Size Matching NO
T8 ER8 Risk 8 Match to Theory NO
T9 ER9 Risk 9 Life Cycle NO
T10 ER10 Risk 10 Deionized Water Check NO
T11 ER11 Risk 11 Assembled Device Size NO
T12 ER12 Risk 12 Transparency Confirmation NO
T13 ER13 Risk 13 Cleaning NO
T14 ER14 Risk 14 Reproducibility Test NO
T15 ER15 Risk 15 Cost Analysis NO
T16 ER16 Risk 16 Spill Test NO
T17 ER17 Risk 17 Safety Standards NO

Design and Flowcharts

Pressure Sensors

Testing for Pressure Sensor

Testing for Pressure Sensor

Risk Assessment

Current Risks

Current Risks

For the live excel version of the photo above, with revision numbers, click here.

Current Risk Chart

Current Risk Chart

For the live Risk Assessment, with Revision number click here.

Phase V Review

Our presentation for this review can be found here.

The notes and subsequent action items gathered from the Detailed Design Review can be found here.

Our peer evaluations can be found here.


MSD I

Planning & Execution Problem Definition Systems Design Subsystem Design Preliminary Detailed Design Detailed Design

Team Members and Roles

Team Values and Norms

Project Plans & Schedules

Risk Management

Meeting Minutes, Notes, & Actions

Background

Stakeholders

Customer Requirements

Engineering Requirements

House of Quality

Risks and Concerns

Phase I Review

Functional Decomposition

Benchmarking

Concept Development

Suppliers

Existing Models

Morphological Chart

Concept Comparison and Selection

Systems Architecture

Risk Assessment

Feasibility

Drawings

Bill of Materials

Risk Assessment

Design Review Materials

Drawings

Bill of Material

Risk Assessment

Design Review Materials

Drawings

Bill of Material

Test Plans

Risk Assessment

Review Material

MSD II

'
Build & Test Prep Subsystem Build & Test Integrated System Build & Test Integrated System Build & Test with Customer Demo Customer Handoff & Final Project Documentation Imagine RIT

Team Vision

Test Plan Summary

Risk Assessment

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Final Documentation

Functional Demo Materials

Plans

Photos

Videos

Handouts


Home