P16081: Circulatory System
/public/

Integrated System Build & Test

Table of Contents

Standings as of 3/17/16

Procurement Status: 100% of parts ordered, barring need to order helicoils.

Projected Budget standing: $313.75 spent out of $600 (52%).

Potential Procurement Problems: Gears have been machined, need to install helicoils, will have updates for next week (3/29/16).

Assembly: Sensor: 100% assembled, Tank: 100%, Resistor: 75% assembled. Tubing: 100% received.

Software Development: 90% complete.

Test Results Summary

Test Results from this phase

For this phase we assembled the system and started the validation of the design and labview code.

Arterial Inlet (orange) pressure and Venous Outlet (blue) pressure test 1

Arterial Inlet (orange) pressure and Venous Outlet (blue) pressure test 1

Arterial Inlet (orange) pressure and Venous Outlet (blue) pressure test 2

Arterial Inlet (orange) pressure and Venous Outlet (blue) pressure test 2

Arterial Inlet (orange) pressure and Venous Outlet (blue) pressure test 3

Arterial Inlet (orange) pressure and Venous Outlet (blue) pressure test 3

Risk and Problem Tracking

MSD overall problem tracking

MSD overall problem tracking

P16081 Circulatory System Model MSD II Problem Tracking

Problem Tracking

Problem Tracking

Problem Tracking.

Functional Demo Materials

LabView Block Diagram and Front Panel displays

Block Diagram for the current LabView Code.

Block Diagram for the current LabView Code.

Front Panel Display for the current LabView Code. This output is incorrect as it was made before it was determined that the LabView code was incorrect. These waveforms were made with the pressure sensors exposed to atmosphere.

Front Panel Display for the current LabView Code. This output is incorrect as it was made before it was determined that the LabView code was incorrect. These waveforms were made with the pressure sensors exposed to atmosphere.

Plans for next phase

Assembly and Construction Manual

Currently we have a work in progress for the assembly and construction manual. A version of this work can be found by clicking here

Project Plans

Project Plan for remainder of MSD II

Project Plan for remainder of MSD II

For a PDF of the Project Plan click here.

For a live document click here.

Metrics of Quality, Peer Review and note from review

For the Metrics of Quality and Peer Reviews for this phase click here.

For notes from the Integrated System Build and Test Review click here.

Tentative Imagine RIT Presentation Schedule

Imagine RIT runs from 10 am to 5 pm. We are allotting ourselves 1 hour to set up the display before Imagine and 1 hour to tear down the display after Imagine. The presentation schedule is as follows:

Mallory: 9-12

Jack: 11-3

Jake: 9-11 : 3-6

Fabian: 12-3

Rob: 3-6

MSD I

Planning & Execution Problem Definition Systems Design Subsystem Design Preliminary Detailed Design Detailed Design

Team Members and Roles

Team Values and Norms

Project Plans & Schedules

Risk Management

Meeting Minutes, Notes, & Actions

Background

Stakeholders

Customer Requirements

Engineering Requirements

House of Quality

Risks and Concerns

Phase I Review

Functional Decomposition

Benchmarking

Concept Development

Suppliers

Existing Models

Morphological Chart

Concept Comparison and Selection

Systems Architecture

Risk Assessment

Feasibility

Drawings

Bill of Materials

Risk Assessment

Design Review Materials

Drawings

Bill of Material

Risk Assessment

Design Review Materials

Drawings

Bill of Material

Test Plans

Risk Assessment

Review Material

MSD II

Build & Test Prep Subsystem Build & Test Integrated System Build & Test Integrated System Build & Test with Customer Demo Customer Handoff & Final Project Documentation Imagine RIT

Team Vision

Test Plan Summary

Risk Assessment

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Final Documentation

Functional Demo Materials

Plans

Photos

Videos

Handouts


Home