P16081: Circulatory System
/public/

Integrated System Build & Test with Customer Demo

Table of Contents

Standings as of 4/14/16

Procurement Status: 100% minus replacement tank for one that was broken on 4/12/16

Projected Budget standing: 60%

Assembly: Total System: 85%, Tray: 5%, Resistor: 95%, Tanks and Fittings: 95%.

Software Development: 95% complete

Assembly Manual: 30% complete

Engineering Requirements with Confidence Levels

Engineering Requirements with Confident Levels

Engineering Requirements with Confident Levels

This PDF shows the photo above, but you can zoom in to more easily read the data.

The above picture and corresponding live link capture our Engineering Requirement and our confidence level of being able to obtain them by the end of the semester.

Test Results Summary

Test Results from this phase

Testing was not able to be completed this phase due to various setbacks with the tanks leaking, breaking and the need to re-write portions of labview.

We determined that our gear ratio for the plate resistors is 1.0769.

With this ratio we determined that 8.64 turns of the drive gear will leave 0.1 inches open in the tube and 9.72 turns will leave 0.05 inches open. Neglecting compression from the tube.

Risk and Problem Tracking

This chart shows the risks that have been faces over the course of Senior Design.

This chart shows the risks that have been faces over the course of Senior Design.

For an excel version of the Risk Chart click here.

Functional Demo Materials

LabView Block Diagram and Front Panel displays

This picture is the block diagram for our current LabView code.

This picture is the block diagram for our current LabView code.

This picture is the Front Panel design for our current LabView code. This would be where the student interacts with the program and obtains results.

This picture is the Front Panel design for our current LabView code. This would be where the student interacts with the program and obtains results.

Plans for next phase

Assembly and Construction Manual

Currently we have a work in progress for the assembly and construction manual. A version of this work can be found by clicking here

Project Plans

Project Plan, Gantt Chart for remainder of MSD II

Project Plan, Gantt Chart for remainder of MSD II

Project Plan, spreadsheet view for remainder of MSD II

Project Plan, spreadsheet view for remainder of MSD II

For a PDF of the Project Plan click here.

For a live document click here.

Lab Outcomes and Expectations

Currently we have a work in progress for the Lab Outcomes and Expectations. A version of this work can be found by clicking here

Timing Diagrams

Timing Diagram at the inlet pressure point.

Timing Diagram at the inlet pressure point.

Timing Diagram at the outlet pressure point.

Timing Diagram at the outlet pressure point.

Poster and Paper

This is a rough draft of our Imagine RIT and Presentation Poster.

This is a rough draft of our Imagine RIT and Presentation Poster.

For a PDF version of this poster click here

Review

This PDF is the notes that were gathered during the review with Dr. Bailey and Mr. Garavuso.

Here is the Peer Review from this phase.

This link is for the outline of our paper. This is an outline and is obviously incomplete.


MSD I

Planning & Execution Problem Definition Systems Design Subsystem Design Preliminary Detailed Design Detailed Design

Team Members and Roles

Team Values and Norms

Project Plans & Schedules

Risk Management

Meeting Minutes, Notes, & Actions

Background

Stakeholders

Customer Requirements

Engineering Requirements

House of Quality

Risks and Concerns

Phase I Review

Functional Decomposition

Benchmarking

Concept Development

Suppliers

Existing Models

Morphological Chart

Concept Comparison and Selection

Systems Architecture

Risk Assessment

Feasibility

Drawings

Bill of Materials

Risk Assessment

Design Review Materials

Drawings

Bill of Material

Risk Assessment

Design Review Materials

Drawings

Bill of Material

Test Plans

Risk Assessment

Review Material

MSD II

'
Build & Test Prep Subsystem Build & Test Integrated System Build & Test Integrated System Build & Test with Customer Demo Customer Handoff & Final Project Documentation Imagine RIT

Team Vision

Test Plan Summary

Risk Assessment

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Final Documentation

Functional Demo Materials

Plans

Photos

Videos

Handouts


Home