P16081: Circulatory System
/public/

Preliminary Detailed Design

Table of Contents

Drawings, Schematics, Flow Charts, Simulations

Updated CAD Models

Arterial System Drawing

Arterial System Drawing

Arterial Part Drawings

Arterial Part Drawings

Venous System Drawings

Venous System Drawings

Venous Part Drawings

Venous Part Drawings

Circulatory System Drawings

Circulatory System Drawings

Resistance Considerations

Concepts for Generating Resistance

Concepts for Generating Resistance

Pugh Chart for the Resistance Generators. The red highlighted ones are the ones that have under preformed versus the pivot column, yellow is about the same as the pivot and green has over preformed versus the pivot.

Pugh Chart for the Resistance Generators. The red highlighted ones are the ones that have under preformed versus the pivot column, yellow is about the same as the pivot and green has over preformed versus the pivot.

LabView Considerations

LabView Block Diagram

LabView Block Diagram

LabView Front Panel

LabView Front Panel

Bill of Material (BOM)

Compliance Tank Bill of Materials

Compliance Tank Bill of Materials

Resistance Bill of Materials

Resistance Bill of Materials

Pressure Bill of Materials

Pressure Bill of Materials

For the Bill of Materials, with Revision Number, click here

Test Plans

Test Plans

Test Plans

Risk Assessment

Current Risks

Current Risks

For the live excel version of the photo above, with revision numbers, click here.

Current Risk Chart

Current Risk Chart

For the live Risk Assessment, with Revision number click here.

Current Engineering and Customer Requirements

Current Engineering Requirements, 11/19/2015

Current Engineering Requirements, 11/19/2015

Current Customer Requirements, 11/19/2015

Current Customer Requirements, 11/19/2015

Phase IV Review

Our presentation for this review can be found here.

The notes and subsequent action items gathered from the Subsystem Design Review can be found here.

The efficiency of our group for this phase of the project can be found here

Our peer evaluations can be found here.



Planning & Execution Problem Definition Systems Design Subsystem Design Preliminary Detailed Design Detailed Design

Team Members and Roles

Team Values and Norms

Project Plans & Schedules

Risk Management

Meeting Minutes, Notes, & Actions

Background

Stakeholders

Customer Requirements

Engineering Requirements

House of Quality

Risks and Concerns

Phase I Review

Functional Decomposition

Benchmarking

Concept Development

Suppliers

Existing Models

Morphological Chart

Concept Comparison and Selection

Systems Architecture

Risk Assessment

Feasibility

Drawings

Bill of Material

Risk Assessment

Design Review Materials

Drawings

Bill of Material

Risk Assessment

Current Requirements

Design Review Materials

Drawings

Bill of Material

Test Plans

Risk Assessment

Review Material

MSD II

'
Build & Test Prep Subsystem Build & Test Integrated System Build & Test Integrated System Build & Test with Customer Demo Customer Handoff & Final Project Documentation Imagine RIT

Team Vision

Test Plan Summary

Risk Assessment

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Final Documentation

Functional Demo Materials

Plans

Photos

Videos

Handouts


Home