P16081: Circulatory System
/public/

Subsystem Build & Test

Table of Contents

Standings as of 2/24/16

Procurement Status: 48% of parts ordered.

Projected Budget standing: $285 spent out of $600.

Potential Procurement Problems: Cost and lead time to construct gears for resistor.

Assembly: Sensor: 95% assembled, Tank: 0% (No fittings or material ordered), Resistor: 60% assembled. Tubing: 80% received (missing 1" ID tubing, need to coordinate with P16080).

Software Development: 70% complete (Briefly tested during conduction of tests related to ER4).

Test Results Summary

In this phase we have tested the pressure sensors and created a calibration curve. Results can be found below.

Calibration Curve

Idealized and Realized pressure curves for a pump resistor supplying a flow rate of 3.2 L/min.

Idealized and Realized pressure curves for a pump resistor supplying a flow rate of 3.2 L/min.

Idealized pressure curve for a pump resistor system with a flow rate of 5 L/min.

Idealized pressure curve for a pump resistor system with a flow rate of 5 L/min.

For a live document with the data for these graphs click here.

Induced Pressure Drop Testing Data

Raw data not filtered

Raw data not filtered

Average Pressure Drop across the resistor for each turn of the bolt

Average Pressure Drop across the resistor for each turn of the bolt

For a live document with data for these graphs click here.

Risk and Problem Tracking

Risk Assessment for current state.

Risk Assessment for current state.

For an up to date Risk Management and Problem Tracking for this phase and MSD II click here.

General Updates with regards to completion

We currently have 35% of testing complete, we have tested the resistors, sensors, and labview. Owners Identified for each test plan. Currently we have 44% of Engineering Specs satisfied.

Updates to the Bill of Material and Engineering Requirements

For the most up to date Bill of Materials click here.

For the most up to date Engineering Requirements click here.

Plans for next phase

Project Plan for remainder of MSD II

Project Plan for remainder of MSD II

For a PDF of the Project Plan click here.

For a live document click here.

Current owners for tasks:

Paper Writing: Mallory

Poster preparation and coordination: Jake

Test plan coordinator: Robert

Imagine RIT coordinator: Mallory

Summary of official proposal has been completed and is waiting for approval from members of both groups.

For the Metrics of Quality and Peer Reviews for this phase click here.

MSD I

Planning & Execution Problem Definition Systems Design Subsystem Design Preliminary Detailed Design Detailed Design

Team Members and Roles

Team Values and Norms

Project Plans & Schedules

Risk Management

Meeting Minutes, Notes, & Actions

Background

Stakeholders

Customer Requirements

Engineering Requirements

House of Quality

Risks and Concerns

Phase I Review

Functional Decomposition

Benchmarking

Concept Development

Suppliers

Existing Models

Morphological Chart

Concept Comparison and Selection

Systems Architecture

Risk Assessment

Feasibility

Drawings

Bill of Materials

Risk Assessment

Design Review Materials

Drawings

Bill of Material

Risk Assessment

Design Review Materials

Drawings

Bill of Material

Test Plans

Risk Assessment

Review Material

MSD II

Build & Test Prep Subsystem Build & Test Integrated System Build & Test Integrated System Build & Test with Customer Demo Customer Handoff & Final Project Documentation Imagine RIT

Team Vision

Test Plan Summary

Risk Assessment

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Review Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Functional Demo Materials

Plans

Team Vision

Test Results

Risk Assessment

Final Documentation

Functional Demo Materials

Plans

Photos

Videos

Handouts


Home