Team Vision for Subsystem-Level Design Phase

The systems architecture from the previous cycle was decomposed into a sub-systems level breakdown. This breakdown included the components and the interfaces of each component. Additionally, a preliminary bill of materials was developed based upon part needs and work was begun on software development.

Feasibility: Prototyping, Analysis, Simulation

CO2 Feasability

Equations developed for required CO2 volume exchange below: public/Systems Level Design Documents/Preliminary CO2 Equation.png Note that these are preliminary - need further input from relevant faculty.

Drawings, Schematics, Flow Charts, etc.

Finalized Functional Decomposition public/Sub-System Documents/functional_decomposition_r2.jpg

Proposed Sub-System Architecture with interfaces public/Sub-System Documents/sub_system_architecture.jpg.jpg

Bill of Materials (BOM)

public/BOM.jpg

Risk Assessment

Risks were updated as prompted from previous review. Risk likelihood/Importance factors have not been decreased yet, though continued testing will allow for this.

public/Systems Level Design Documents/Risk_Management_R2.jpg

Current Risk file located here: Risk Assessment Spreadsheet

CAD Update

public/IsometricOCT.jpg

Design Review Materials

Plans for next phase


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation