Team Vision for Detailed Design Phase

During this phase our team planned to complete experiments which incorporated parallel copper electrodes manually placed into to microchannel. Additionally, we planned to complete feasibility on the voltages and frequencies established in the engineering requirements to ensure the power supply can adequately produce a signal to create the proper dielectrophoretic force.

Throughout the phase, our team complete the feasibility experiments and successfully created a dielectrophoretic force powerful enough to move yeast cells in a microchannel using manually placed copper electrodes and a signal that our current power supply design can produce.

Prototyping, Engineering Analysis, Simulation

Experiment on 2015.12.03

public/Detailed Design Documents/Phase 5/Experiment Results/2015.12.03_ElectrodeSpacing.JPG

Video of eDEP at 1 Vpp, +10 VDC, 1 mHz

Video of eDEP at 1 Vpp, +10 VDC, 1 MHz

Experiment on 2015.12.05

public/Detailed Design Documents/Phase 5/Experiment Results/2015.12.05_ElectrodeSpacing.JPG

Video of eDEP at 1 Vpp, 1 mHz

Drawings, Schematics, Flow Charts, Simulations

Mechanical Drawings

The technical drawings for the manufactured parts can be found below:

Electrical Drawings

public/Photo Gallery/PowerAmpsSchematic.PNG

public/Photo Gallery/PowerAmpsLayout.PNG

public/Photo Gallery/EE 1.PNG

public/Photo Gallery/EE 2.PNG

public/Photo Gallery/EE 3.PNG

public/Photo Gallery/EE 4.PNG

Channel Fabrication

public/Photo Gallery/channel1.PNG

public/Photo Gallery/channel2.PNG

public/Photo Gallery/channel3.PNG

public/Photo Gallery/channel4.PNG

public/Photo Gallery/channel5.PNG

public/Photo Gallery/Laser_PDMS.JPG

public/Photo Gallery/PlanarFab.JPG

Bill of Material (BOM)

See the Bill of Materials here.

Test Plans

The test plan for each engineering requirement can be download from the links below:

The Following Test Plans are not Directly Correlated to Engineering Requirements:

Design and Flowcharts

This section should continue to be updated from your systems level design documentation.

Risk Assessment

public/Detailed Design Documents/Phase 5/RisksUpdate.PNG

Updated Documents

Gantt Chart Update

public/Detailed Design Documents/Phase 5/GanttChartUpdate.PNG

Engineering Requirements Update

public/Detailed Design Documents/Phase 5/EngineeringRequirementsUpdate.PNG

Design Review Materials

Plans for next phase

(Use the individual 3-week plan template for this)


MSD I & II MSD I MSD II

Project Management

Project Photos and Videos

Imagine RIT

Planning & Execution

Problem Definition

Systems Design

Subsystem Design

Preliminary Detailed Design

Detailed Design

Build & Test Prep

Subsystem Build & Test

Integrated System Build & Test

Integrated System Build & Test with Customer Demo