P16203: Smart Power Supply Test Bench
/public/

Subsystem Build & Test

Table of Contents

Team Vision for Subsystem Level Build & Test Phase

What did your team plan to do during this phase?

The goals for this phase were to test and prove the abilities of the subsystems of our enclosure.

This includes:

Further documentation as well as beginning phases of the poster and project are to be discussed.

What did your team actually accomplish during this phase?

What was accomplished during this phase was successful testing of our load board (designs can be viewed on the DDR page) which automatically controls current and voltage for the system. Various software functions were written and successfully compiled, mostly revolving around testing the controller board, which is the Main Board assembly able to be viewed on the DDR page. The compiled software functions can be found here while a working excel document of assigned functions, their importance, and completion of them can be found here. The Main Board and the Relay Board were unable to be built and tested due to a delay in delivery that couldn't have been prevented.

Test Results Summary

Summarize test results and assess effectiveness of test plans to unambiguously demonstrate satisfaction of the engineering requirements

Instructions

  1. Quantitatively summarize the capabilities, performance, throughput, and robustness of your subsystems as demonstrated by execution of the text plan. Document your testing with photos or videos in addition to test data.
  2. Evaluate how well the test plan was able to confirm satisfaction of subsystem requirements
  3. Include snapshot of testing completed to date, and include link to live requirements and testing document

Inputs & Source

  1. Test Plan
  2. Subsystem fabrication

Outputs & Destination

  1. Test Results
  2. System integration

Subsystem Wiring Diagram

Below is a diagram of the wiring between subsystems.
 Subsystem Wiring Diagram

Subsystem Wiring Diagram

Updated 3D Model

 Updated 3D model. Added aesthetic L brackets.

Updated 3D model. Added aesthetic L brackets.

Risk Assessment

 Updated Risk Assessment. Items highlighted in grey were added this phase.

Updated Risk Assessment. Items highlighted in grey were added this phase.

Problem Tracking

 Updated Problem Tracking

Updated Problem Tracking

Documentation

Documentation relevant to this phase are listed as below.

Functional Demo Materials

Plans for next phase

Gantt Chart Plan for Semester

Gantt Chart Plan for Semester


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation