Team Vision for Subsystem Level Build & Test Phase

Summarize:

During this phase the mechanical sub team planned to manufacture the majority of the actuation, frame, and safety enclosure subsystems. The electrical sub team planned to QC check all electrical components as they arrived as well as wire and test the power drive circuit once all drive subsystem components were acquired.

During this phase the mechanical sub team spent time acquiring used equipment to minimize costs. Nearly $1000.00 was saved in total project cost however it came at the expense of our manufacturing timeline. Actuation and frame design needed to be reworked in order to accommodate linear bearings of different size. By phase end manufacturing of the frame and actuation system began and will continue through the next phase.

The electrical sub team was unable to wire and test the power drive subsystem during this phase due to the mechanical sub team timeline. Instead, the majority of time was spent developing the GUI and testing electrical components as they arrived. The DAQ system saw much development and will continue to be refined. Once the frame is complete they plan to focus time to wire and test the power drive system.

Test Plans Summary

Inputs & Source Test Plans

Mechanical Test Plans

Test Results Summary

Outputs & Destination

  1. Test Results
  2. PC Power Supply Acceptance Test Results
  3. Shock Dyno Control GUI
Graphical User Interface

Graphical User Interface

  1. System integration

Risk and Problem Tracking

Risk Management Table

Risk Management Table

Risk Ranking over Time

Risk Ranking over Time

Risk Management Document

Bill of Materials (BOM)

View xlsx
BOM

BOM

Updated CAD Model

System Geometry

System Geometry

Automation Components Acquired

Automation Components Acquired

Automation Components Acquired

Updated Linear Bearing Calculations and Carrier Bracket

Carrier Bracket Assembly

Carrier Bracket Assembly

Linear Bearing Calculation Figures

Linear Bearing Calculation Figures

Linear Bearing Calculations

Linear Bearing Calculations

Frame Fabrication Status

Frame Fabrication Status

Frame Fabrication Status

Assembly Instructions

Arduino Assembly Instructions

Electrical Chassis and Gear Motor Assembly

Mechanical Systems Build and Assembly Instructions

Timing Diagram

Functional Demo Materials

Plans for next phase

MSD II Schedule (part 1)

MSD II Schedule (part 1)

MSD II Schedule

MSD II Schedule

Latest Schedule


Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation