P16221: FSAE shock dyno
/public/

Subsystem Design

Table of Contents

Team Vision for Subsystem-Level Design Phase

Team Goals for this Phase:

What did your team actually accomplish during this phase?

Overall all goals are either in progress or near completion. Actuation method will be determined on 10/23/2015. From there we will pursue completion of detailed design for week 12, and refinements by week 15.

Feasibility: Prototyping, Analysis, Simulation

Safety Considerations

Goals of the Safety Sub-System

Important Features

Enclosure

Interfaces

User Interface Prototyping

Goals of the UI

Important Features

Prototype User Interface

Prototype User Interface

Damper Calculations

Damper Calculations

Damper Curve

Damper Curve

Ideal Results from Test Stand

Ideal Results from Test Stand

IR Sensor INFKL-150

View PDF
IR Sensor Test

IR Sensor Test

Drawings, Schematics, Flow Charts, etc.

Top Level Electronics Design

View PDF
Top Level Design

Top Level Design

Data Flow

Data Flow

Electrical System Schematic Part 1

Electrical System Schematic Part 1

Electrical System Schematic Part 2

Electrical System Schematic Part 2

Top Level Mechanical Design

Preliminary System CAD Model Calc

Preliminary System CAD Model Calc

View PDF

Crossbar Hardware Calc

Crossbar Hardware Calc

Mast Sizing Calc

Mast Sizing Calc

Ratio Bar and Bolt Calcs

Ratio Bar and Bolt Calcs

View PDF

Bill of Materials (BOM)

View Spreadsheet

BOM Table

BOM Table

BOM Pie Chart

BOM Pie Chart

Risk Assessment

View Spreadsheet

Risk Management

Risk Management

Team Efficiency

Design Review Materials

Plans for next phase

As a team, where do you want to be in three weeks at your next review?

Home | Planning & Execution | Imagine RIT

Problem Definition | Systems Design | Subsystem Design | Preliminary Detailed Design | Detailed Design

Build & Test Prep | Subsystem Build & Test | Integrated System Build & Test | Integrated System Build & Test with Customer Demo | Customer Handoff & Final Project Documentation